http://www.tyan.com
21
2.7 - Heatsink Installation Procedures
Type A: CAM LEVER (TYPE) INSTALLATION
1. After placing backplate and
interface material under motherboard
place heatsink retention frame on top
of motherboard. Align plastic retention
bracket screw holes with CPU back-
plate standoffs.
Tighten screws to secure plastic
retention bracket. Repeat for the other
side.
DO NOT OVER TIGHTEN.
2. After tightening screws secure
metal clip to plastic retention bracket
center tab. Repeat for the other side
of heatsink.
3. After securing metal clip to plastic
retention bracket center tab, push
down on plastic clip to lock plastic clip
to side tab.
Содержание S2891
Страница 6: ...http www tyan com 6 NOTES...
Страница 9: ...http www tyan com 9 2 2 Block Diagram Thunder K8SRE S2891 Block Diagram...
Страница 12: ...http www tyan com 12 J14 J25 J140 J42 J77 J53...
Страница 16: ...http www tyan com 16 FAN8 FAN9 FAN6 FAN5 FAN2 FAN1 FAN7 FAN3 FAN4...
Страница 34: ...http www tyan com 34...
Страница 58: ...http www tyan com 58...
Страница 71: ...http www tyan com 71...