54
http://www.tyan.com
4. Slide the inner rail to its full length. Note that to slide to its full length, push the
locking tab of the rail upward and then the rail can slide freely. There are three holes
on each rail which are used to hook and secure the chassis.
5. Align the studs on the chassis with the holes on the rails and make sure the
chassis is securely hooked.
Содержание B8236G70W8HR-HE-IL
Страница 1: ...Welcome to the Iceberg Altus 2850GTi Manual...
Страница 2: ...1 http www tyan com GN70 B8236 IL Service Engineer s Manual...
Страница 3: ...2 http www tyan com...
Страница 13: ...http www tyan com 12...
Страница 33: ...http www tyan com 32 1 5 5 System Block Diagram S8236 IL...
Страница 39: ...http www tyan com 38 3 Slide the rear top cover out...
Страница 56: ...http www tyan com 55 6 Push the chassis back into the rack 7 The installation is now complete...
Страница 65: ...http www tyan com 64 5 Follow the steps described earlier in reverse to reinstall the Front Panel Board...
Страница 79: ...http www tyan com 78 NOTE...
Страница 81: ...http www tyan com 80...
Страница 83: ...http www tyan com 82 NOTE...
Страница 85: ...http www tyan com 84 BIOS Temp Sensor Name Explanation...