http://www.tyan.com
9
·
Make sure the rack is level and stable before installing an appliance in the
rack.
·
Make sure the leveling jacks are extended to the floor.
·
Make sure the full weight of the rack rests on the leveling jacks.
·
Always load the rack from the bottom up. Load the heaviest component in
the rack first.
·
Make sure the rack is level and stable before pulling a component out of the
rack.
·
Make sure only one component is extended at a time. A rack might become
unstable if more than one component is extended.
To avoid damage to the equipment:
·
The rack width and depth must allow for proper serviceability and cable
management.
·
Ensure that there is adequate airflow in the rack. Improper installation or
restricted airflow can damage the equipment.
·
The rack cannot have solid or restricted airflow doors. You must use a mesh
door on the front and back of the rack or remove the doors to ensure adequate
air flow to the system.
·
If you install the Model in a rack, do not place equipment on top of the unit. It
will cause restricted airflow and might cause damage to the equipment.
·
Make sure the product is properly matted with the rails. Products that are
improperly matted with the rails might be unstable.
·
Verify that the AC power supply branch circuit that provides power to the rack is
not overloaded. This will reduce the risk of personal injury, fire, or damage to the
equipment. The total rack load should not exceed 80 percent of the branch circuit
rating. Consult the electrical authority having jurisdiction over your facility wiring
and installation requirements.
·
Verify that the AC power supply branch circuit that provides power to the rack is
not overloaded. This will reduce the risk of personal injury, fire, or damage to the
equipment. The total rack load should not exceed 80 percent of the branch circuit
rating. Consult the electrical authority having jurisdiction over your facility wiring
and installation requirements.
·
Verify that the AC power supply branch circuit that provides power to the rack is
not overloaded. This will reduce the risk of personal injury, fire, or damage to the
equipment. The total rack load should not exceed 80 percent of the branch circuit
rating. Consult the electrical authority having jurisdiction over your facility wiring
and installation requirements.
Содержание B5630G86CV12
Страница 1: ...http www tyan com 1 GT86C B5630 Service Engineer s Manual...
Страница 25: ...http www tyan com 25 1 3 5 Internal View...
Страница 30: ...http www tyan com 30 2 Push the cover in the direction of the arrow and take out the top cover from chassis kit...
Страница 42: ...http www tyan com 42 4 Reinstall the riser bracket to the chassis...
Страница 46: ...http www tyan com 46 2 Secure the chassis to the rack by rotate the thumb screws...
Страница 69: ...http www tyan com 69...
Страница 95: ...http www tyan com 95 4 4 1 3 PCH sSATA Configuration...
Страница 101: ...http www tyan com 101 4 4 3 Server ME Configuration Read only...
Страница 107: ...http www tyan com 107 4 5 3 1 Memory Topology Read only...
Страница 121: ...http www tyan com 121 4 5 5 3 Intel VMD Technology...
Страница 132: ...http www tyan com 132 4 6 2 BMC Network Configuration...
Страница 141: ...http www tyan com 141 4 8 1 Network Device BBS Priorities Boot Option 1 Set the system boot order Device Name Disabled...
Страница 155: ...http www tyan com 155 5 Insert the IO Plate to the OCP card LAN port 6 Screw the IO Plate to the chassis...
Страница 156: ...http www tyan com 156 7 Insert the LAN card into the OCP slot 8 Secure the LAN card to the chassis...
Страница 160: ...http www tyan com 160 NOTE...