
3. Push the chassis in and pull the latch key (A). Then push the whole
system into the rack (B).
A
B
4. Secure the mounting
ears of chassis to the
rack with 2 M6 x 13 (B)
screws.
Note:
To avoid injury, it is strongly recommended that two people
lift the TN68-B4989 into the place while a third person
screws it to the rack.
Chapter 2: Setting Up
41
Содержание B4989
Страница 1: ...Transport TN68 B4989 Service Engineer s Manual...
Страница 2: ......
Страница 27: ...1 6 6 System Block Diagram Chapter 1 Overview 19...
Страница 30: ...22 Chapter 1 Overview...
Страница 41: ...Chapter 2 Setting Up 33...
Страница 43: ...5 Secure the holder to the chassis follow the above steps in reverse Chapter 2 Setting Up 35...
Страница 50: ...42 Chapter 2 Setting Up...
Страница 54: ...46 Chapter 3 Replacing Preinstalled Components...
Страница 72: ...Rear View 64 Chapter 3 Replacing Preinstalled Components...
Страница 86: ...Step 6 Connect the data cables 78 Appendix II Installing the Internal 2 5 HDD...
Страница 92: ...84 Appendix IV Cable Connection Tables...
Страница 96: ...88 Appendix V FRU Parts Table...