31
TRANSPORTING
Turn cutting head to vertical position with flails away from tractor.
Swing machine rearwards by powering breakback ram to 'open' position.
Fold 'in' second/outer boom with cutting head, until boom main tube contacts rubber
buffer fixed to first boom.
The cutting head should now be positioned behind and slightly inside tractor rear tyre.
The unit is now ready for transport.
WARNING
Never transport a machine with the Booms open -
Ensure Booms are in contact with each other at all times.
Содержание TC526
Страница 1: ...TWOSE TC526 Hedgecutter Grass Mower Operation Manual Publication No 676 June 2011 Rev 09 01 12...
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 15: ...4 SAFETY INFORMATION...
Страница 27: ...16 1 2 3 4 5 6...
Страница 28: ...17 8 10 7 9 12 11...
Страница 29: ...18 FLAIL MOTOR HOSE INSTALLATION...
Страница 33: ...22 CABLE CONTROLS LEVER FUNCTIONS...
Страница 34: ...23 SWITCHBOX CONTROLS Operation and Functions...
Страница 36: ...25 MONOLEVER CONTROLS Operation and Functions...
Страница 38: ...27 PROPORTIONAL CONTROLS Operation and Functions...
Страница 56: ......