INSTALLATION INSCTRUCTIONS
3.1 Preparations before installation
3.1.1 Tools and equipments needed
√ Electrical drill
√ Open wrenches
√ Screw drivers
√Adjustable spanner
3.1.2 List for parts checking ---Annex 1
(
Packing list
)
Unfold the package and check if any parts missed as per Annex 1. Do not hesitate to contact us in case any parts missed, but if you do not
contact us and insist installing upon the lack of some parts, we as well as our dealers will not bear any responsibility for this and will
charge for any parts subsequently demanded by the buyer.
3.1.3 Ground conditions
The lift should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less than 5mm
and minimum thickness of 200mm. In addition, newly built concrete ground must undergo more than 28days’ cure and reinforcement.
3.2 Precautions for installation
3.2.2 Joints of oil hose and wiring must be firmly connected in order to avoid leakage of oil hose and looseness of electrical wires.
3.2.3 All bolts should be firmly screwed up.
3.2.4 Do not place any vehicle on the lift in the case of trial running.
3.3 Installation
Step1: Choose installation site.
Use a fork lift to place the machine at installation site as required. See
Annex 3
for space requirements on the installation site.
Step 2: Connect oil hoses.
Connect oil hoses as per the diagram for oil hose connection and the following pictures. (This step is very important and it is quite
necessary to understand the diagram of oil hose connection in Annex 4 before operation)