2.4 Connect the power supply
Plug the correct end of the supplied power cord into the power input slot on the
back of the moisture analyzer, and connect the other end to the power outlet.
Note: For best measurement results, use or calibrate after at least 60
minutes of power up.
2.5
Adjustment level
The moisture analyzer has a horizontal bubble and two horizontal adjustment
feet. To compensate for the effect of the tilting symmetry of the placement
position during the weighing process, the horizontal foot can be adjusted until
the horizontal bubble is at the center position.
Note: The level must be re-adjusted each time the position changes.
Operation
3. Operating
The machine’s display
6
Содержание FZ-MA100C
Страница 1: ...Analizador de humedad Fuzhou FZ MA100C ...
Страница 2: ...Moisture Analyzer Operation Manual ...
Страница 22: ......