21
2
Preparation for Measurements
2.1
Measurement Work
fl
ow
Before using the instrument, be sure to read “Usage Notes” (p. 8).
Installation and connection
Insert the battery. (p. 22)
As necessary, have other
optional items available and
ready.
Perform the startup check. (p. 29)
Measurement
Turn on the power and select the
measurement function.
To ensure safe operation,
make sure to select a
measurement function
and then connect
the test leads to the
measurement object.
To ensure safe operation,
make sure to select a
measurement function
and then connect
the test leads to the
measurement object.
2
2
11
Attach the test leads to the
measurement terminals. (p. 24)
As necessary, perform zero adjustment.
Connect the test leads to the
measurement object.
(As necessary)
Hold the measured value. (p. 43)
End of the measurement
Move the test leads away from the measurement object and then
turn off the power.
Содержание DT4200
Страница 2: ......
Страница 6: ...iv Contents ...
Страница 60: ...54 Power on Option Table ...
Страница 76: ...Appx 2 RMS and Average ...
Страница 77: ...16 01 EN ...
Страница 78: ......
Страница 79: ......