
Art.-Nr. 676.15.67.00
Dated 2021/09/09
- 12 -
GB
9
F i l l i n g , f l u s h i n g a n d d r a i n i n g
Filling
In order to fill the solar system the supply and
return ball valve [1, 2] must be set to the "gravity
brake open" position (45°). Turn the spindle [B]
on the flow indicator to the "S" position. The slot
is now horizontal, while the flat section points to
the left.
Connect the filling hose to the filling and drain
valve [4a].
Connect the drain hose to the filling and drain
valve [4b].
Open the filling and drain valves and fill the solar
system.
Note:
Do not exceed the maximum filling and flushing
speed of 40 l/min, as this could damage the com-
ponents.
Flushing
To flush the solar system turn the supply and
return ball valve [1, 2] to the "gravity brake open"
position (45°).
Turn the spindle [B] on the flow indicator to the
"S" position. The slot is now horizontal, while the
flat section points to the left.
Open the filling and drain valves [4a, 4b] and start
the flushing procedure.
Flushing the pump
Set the spindle [B] on the flow indicator to the
flow position. The slot is now vertical, while the
flat section points downwards. The air that is still
trapped in the pump can now rise to the top.
Adjust the spindle so that it is horizontal again
and flush the solar system until the residual air is
expelled from the system.
If no flow rate is visible on the flow indicator after
conducting the flushing procedure,
conduct a
controlled flush.
Draining
To drain the solar system set the supply and re-
turn ball [1, 2] valve to the "gravity brake open"
position (45°). Turn the spindle [B] to the "flow"
position. The slot is now vertical, while the flat
section points downwards. Open the filling and
drain valve [4b].
Содержание tubra- PGS multi
Страница 1: ...D tubra PGS multi Pumpstation für Solaranlagen Montage und Bedienungsanleitung ...
Страница 6: ...Art Nr 676 15 67 00 Stand 2021 09 09 6 D 3 2 Abmessungen Platzbedarf 3 3 Druckverlust ...
Страница 17: ...Art Nr 676 15 67 00 Stand 2021 09 09 17 D 15 2 Konformitätserklärungen 15 2 1 Wilo Yonos Para ...
Страница 18: ...Art Nr 676 15 67 00 Stand 2021 09 09 18 D 15 2 2 Grundfos ...
Страница 19: ...Art Nr 676 15 67 00 Stand 2021 09 09 19 D ...
Страница 21: ...GB tubra PGS multi Pump station for solar systems Assembly and operating manual ...
Страница 26: ...Art Nr 676 15 67 00 Dated 2021 09 09 6 GB 3 2 Dimensions required space 3 3 Pressure loss ...
Страница 37: ...Art Nr 676 15 67 00 Dated 2021 09 09 17 GB 15 2 Declarations of conformity 15 2 1 Wilo Yonos Para ...
Страница 38: ...Art Nr 676 15 67 00 Dated 2021 09 09 18 GB 15 2 2 Grundfos ...
Страница 39: ...Art Nr 676 15 67 00 Dated 2021 09 09 19 GB ...
Страница 41: ...I tubra PGS multi Stazione pompa per impianti solari Istruzioni di assemblaggio e d uso ...
Страница 59: ...Art Nr 676 15 67 00 Ultimo aggiornamento 2021 09 09 19 I 15 2 2 Grundfos ...