background image

4

TOOLS REQUIRED IN INSTALLATION 

Rotary hammer drill or similar 
3/4” Masonry bit   
Hammer 
4 foot level 
Open-end wrench set : 7/16” – 1-1/8” 
Socket and ratchet set: 7/16” – 1-1/8” 
Hex-key / Allen wrench set 
Medium crescent wrench 
Medium pipe wrench 
Crow bar 
Chalk line 
Medium flat screwdriver 
Tape measure: 25 foot minimum 
Needle nose pliers 
Fork lift   

Содержание FP14KO-A

Страница 1: ...ive Single point pneumatic safety release mechanism 20 wide non skid diamond plate runways Powder coated paint finish C channel construction Hydraulic operation for minimum maintenance Three turntable...

Страница 2: ...FP14KO A 14 000 lb Capacity Open Front Alignment Lift ASSEMBLY OPERATION MANUAL...

Страница 3: ......

Страница 4: ...ive Single point pneumatic safety release mechanism 20 wide non skid diamond plate runways Powder coated paint finish C channel construction Hydraulic Operation for minimum maintenance Three turntable...

Страница 5: ...before signing clear on the shipping receipt Freight damage is not considered a warranty issue and therefore must be noted for any potential recovery with the shipping company The customer is require...

Страница 6: ...se valve in pump and hydraulic system Pneumatic lock release system and redundant cable failure safety device Built in rails for rolling jacks 2 SPECIFICATIONS CAPACITY 14000 LBS 6300Kg MOTOR POWER 22...

Страница 7: ...3 Note All d Fig 1 imensions typical...

Страница 8: ...Masonry bit Hammer 4 foot level Open end wrench set 7 16 1 1 8 Socket and ratchet set 7 16 1 1 8 Hex key Allen wrench set Medium crescent wrench Medium pipe wrench Crow bar Chalk line Medium flat scr...

Страница 9: ...mm in height Fig 2 T O t 2 FLOOR REQUIREMENTS The lift should be installed on a 3000 PSI concrete with little gradients hickness of concrete 6 inch 150 mm The leveling of whole area 3 8 inch 10 mm r e...

Страница 10: ...tach the rear crossbeam to the left main platform with cylinder and cables 3 Line the cables through the hole on the crossbeam out from the end Be sure the cables are in the proper sheave grooves Fig...

Страница 11: ...carefully with the location of the columns and its plumb Using a tape measure to measure the distance between the opposite corners of the base plate on the columns Equal values will insure the liftin...

Страница 12: ...n cables end to level the platforms 7 Lower the platforms by simultaneously pressing the air release valve and the release lever on the power unit 8 If the platforms not level adjust the height of the...

Страница 13: ...f lift z Caution the power unit operates at high pressure z Never permit passengers to ride in the vehicle z Prohibit unauthorized persons from being in shop area while lift is in use z Never exceed t...

Страница 14: ...rack z z z z z z z z Check hydraulic connections and hoses for leakage Check cables connections bends cracks and looseness Check for frayed cables in both raised and lowered position Check snap rings...

Страница 15: ...equired Check hydraulic and air cylinder rod and rod end threads for deformation or damage Check cylinder mount for looseness and damage Relocating or changing components may cause problems Each compo...

Страница 16: ...PARTS DRAWING 1 1 7 9 10 4 3 5 6 11 12 6 12 6 12 17 18 19 16 20 24 25 21 22 23 26 2 3 8 13 14 15 12...

Страница 17: ...PARTS DRAWING 2 III 38 2234 12 6 16 52 93 94 95 96 97 97 102 103 13...

Страница 18: ...PARTS DRAWING 3 53 40 41 54 55 70 71 72 73 3 74 33 75 33 43 33 22 76 PART1 A PART2 A PART2 B PART1 B 14...

Страница 19: ...PARTS DRAWING 4 PART2 B PART1 B 92 79 80 81 82 73 72 PART1 A PART2 A 40 83 84 70 54 43 33 85 86 87 88 80 81 80 89 33 22 90 33 91 15...

Страница 20: ...PARTS DRAWING 5 27 4 3 28 29 30 31 32 33 22 34 22 35 36 37 38 22 34 39 40 41 42 33 43 44 40 41 45 43 33 45 46 47 48 49 50 51 52 16...

Страница 21: ...PARTS DRAWING 6 57 66 65 56 58 67 19 64 59 61 60 63 62 P A R T1 A 78 P A R T1 B 57 3 69 68 66 62 58 65 19 67 PART2 A PART2 B 77 17...

Страница 22: ...PARTS DRAWING 7 93 94 95 96 98 99 100 101 18...

Страница 23: ...X25 18 D8_GB93 spring washer 4 D8 19 D8_GB95 flat washer 12 steel D8 20 Control box 1 21 M6x20_GB5781 hexangular bolt 4 M6X20 22 D6_GB95 flat washer 84 steel D6 23 D6_GB93 spring washer 4 D6 24 M6X16_...

Страница 24: ...inder 4 62 SGM 804 04 tie rod spring 8 63 D2x35_GB91 snap ring 4 carbon steel D2X35 64 D10_GB894 1 snap spring 4 D10 65 D25_GB894 1 snap spring 8 D25 66 D2x40_GB91 snap ring 8 carbon steel D2X40 67 M8...

Страница 25: ...back plate 2 91 TT5D 600 01A 00 cross beam 1 weld assembly 92 TT5D 600 01B 00 cross beam 1 weld assembly 93 TT5DL 100 20 Steel Cable C 1 94 TT5DL 100 20 Steel Cable D 1 95 TT5DL 100 20 Steel Cable B 1...

Страница 26: ......

Страница 27: ...wering valve See drawing below Step 2 Using an Allen wrench and shop towel with shop towel in place to catch fluid loosen the check valve plug 2 turns to allow it to leak Step 3 Push the START button...

Отзывы: