4
TOOLS REQUIRED IN INSTALLATION
Rotary hammer drill or similar
3/4” Masonry bit
Hammer
4 foot level
Open-end wrench set : 7/16” – 1-1/8”
Socket and ratchet set: 7/16” – 1-1/8”
Hex-key / Allen wrench set
Medium crescent wrench
Medium pipe wrench
Crow bar
Chalk line
Medium flat screwdriver
Tape measure: 25 foot minimum
Needle nose pliers
Fork lift
Содержание FP14KO-A
Страница 2: ...FP14KO A 14 000 lb Capacity Open Front Alignment Lift ASSEMBLY OPERATION MANUAL...
Страница 3: ......
Страница 7: ...3 Note All d Fig 1 imensions typical...
Страница 16: ...PARTS DRAWING 1 1 7 9 10 4 3 5 6 11 12 6 12 6 12 17 18 19 16 20 24 25 21 22 23 26 2 3 8 13 14 15 12...
Страница 17: ...PARTS DRAWING 2 III 38 2234 12 6 16 52 93 94 95 96 97 97 102 103 13...
Страница 18: ...PARTS DRAWING 3 53 40 41 54 55 70 71 72 73 3 74 33 75 33 43 33 22 76 PART1 A PART2 A PART2 B PART1 B 14...
Страница 22: ...PARTS DRAWING 7 93 94 95 96 98 99 100 101 18...
Страница 26: ......