Tuthill NEXTEC FILL-RITE NX25-DDC Series Скачать руководство пользователя страница 16

   |  NX25-DDC SERIES DC FUEL TRANSFER PUMP

Tuthill Corporation  |  8825 Aviation Drive Fort Wayne, Indiana 46809

P (800) 634-2695  |  (260) 747-7524  |  F (800) 866-4681

www.tuthill.com | www.fillrite.com | www.sotera.com

DC002234-004 Rev. 4

ATEX

MADE IN

USA

Safety Testing Certifications 

This Fill-Rite line of pumps have been safety tested for compliance to strict regulatory standards. Check the information on the motor barrel 
label of your pump to determine the certifications that are applicable to your particular model.

The following standards were used to show compliance in North America:

UL 674 – Electric Motors and Generators for Use in Hazardous (Classified) Locations, 5th Edition.

The following standards were used to show compliance in the European Union:

Directive 2006/42/EC – Directive on machinery.
EN 809:1998 +A:2009 – Pumps and pump units for liquids – Common safety requirements.
EN ISO 12100:2010 – Safety of Machinery – Basic concepts, general principles for design.
Directive 2004/108/EC – Electromagnetic compatibility.
Directive 2011/65/EU – Restrictions of the use of certain hazardous substances in electrical and electronic equipment.
ISO 80079-36 = Explosive atmospheres - Part 36: Non-electrical equipment for explosive atmospheres - Basic method and requirements.
ISO 80079-37 = Explosive atmospheres - Part 37: Non-electical equipment for explosive atmospheres - Non-electrical type of protection 
constructional safety “c”, control over ignition source “b”, liquid immursion “k”. 
EN 60079-0:2012+A11:2013 – Explosive atmospheres – Part 0: Equipment – General requirements.
EN 60079-1:2014 – Explosive atmospheres – Part 1: Equipment protection by flameproof enclosures “d”.
IEC 60079-0 – Explosive atmospheres – Part 0: Equipment – General requirements.
IEC 60079-1 – Explosive atmospheres – Part 1: Equipment protection by flameproof enclosures “d”.

The fasteners used to assemble the flame-proof enclosure are of a property class (grade) 12.9. 
Manufacturer is to be contacted for information on the dimensions of the flameproof joints.

2809

Содержание NEXTEC FILL-RITE NX25-DDC Series

Страница 1: ...MADE IN USA NX25 DDC SERIES DC FUEL TRANSFER PUMPS Installation and Operation Manual This manual contains English language only Visit www fillrite com to download more languages...

Страница 2: ...goods subject to misuse neglect accident improper installation or maintenance or have been repaired by anyone other than the Manufacturer or its authorized representative THE FOREGOING WARRANTIES ARE...

Страница 3: ...r to attempting to install or operate your new pump Become familiar with the terms and diagrams and pay close attention to the highlighted areas with the following labels CAUTION Failure to observe a...

Страница 4: ...mediately with a petroleum product gasoline diesel light oil etc to eradicate residual water IMPORTANT A Fill Rite filter should be used on the pump outlet to ensure no foreign material is transferred...

Страница 5: ...lt Note that the bolt is inserted through the hole closest to the nozzle opening and the boot is then positioned so the peg on the pump mounting surface inserts in the top second hole of the boot This...

Страница 6: ...on device a k a vacuum breaker is important because it will break a liquid siphon if there is an open nozzle or a leaking hose below the fluid level in the tank when the pump is turned off Fill Rite r...

Страница 7: ...he cable into the pump to prevent unexpected starting of the motor Unexpected motor start can cause unintended discharge of fuel creating an explosion and fire hazard Note that the switch does not int...

Страница 8: ...the power cable from the pump while pump is switched on or connected to a power source ALWAYS switch the pump off and disconnect all the clamps from the power source PRIOR to disconnecting the power c...

Страница 9: ...illrite com tuthill com INSTALLATION AND OPERATION MANUAL NX25 DDC Dimensional Information Bung Mount Dimensional Information Foot Mount Dimensional Information All measurements are in inches millimet...

Страница 10: ...PP Mount 2 Bung NPT or BSPT Materials of construction pump housing Cast Iron Materials of construction wetted material BUNA N Fluorocarbon Rotor materials of construction Powdered Iron Rotor vane mate...

Страница 11: ...refully align the slot in the top of the bypass valve retainer with the locking tab on top of the bypass valve Figure 4 2 Push the bypass valve retainer down over the locking tab on the bypass valve P...

Страница 12: ...zzle boot kit KIT321SK External seal kit KIT321JC Junction box cover kit KIT321SW Switch kit KIT321ASN Anti siphon kit Servicing Rotor Vanes and Shaft Seals The rotor vanes and shaft seals are inside...

Страница 13: ...fillrite com tuthill com INSTALLATION AND OPERATION MANUAL NX25 DDC Exploded View Bung Mount Configuration Foot Mount Configuration KIT321NB KIT321BG KIT321SW KIT320SL KIT321RG KIT321SW KIT320SL KIT32...

Страница 14: ...inlet plumbing Reduce vertical or horizontal distance from pump to liquid 6 Bypass valve stuck Open valve remove debris Low capacity 1 Excessive dirt in screen Remove and clean screen 2 Suction line...

Страница 15: ...and require the pump to be returned to the manufacturer 3 Tone Faults Application Installation faults 4 Tone Faults Hardware faults Tones Condition Cure Hardware fault auto shut off Troubleshoot as d...

Страница 16: ...ty of Machinery Basic concepts general principles for design Directive 2004 108 EC Electromagnetic compatibility Directive 2011 65 EU Restrictions of the use of certain hazardous substances in electri...

Отзывы: