Turnigy AE-20A Скачать руководство пользователя страница 3

Cut off the power ,the throttle range have finished the setting

ding---ding---ding

confirm tone of the bottom position of throttle 

Move the throttle stick to the bottom position,wait for 2 seconds.

                                                                                         

Cut off the power of ESC after confirm the ESC connection and working is normal,keep the 
transmitters start and move the throttle stick to the top position.
Connection the power of ESC,the motor will emit “

1 2 3”------ “

1 2 3 4 5”(it means enter 

into  the  setting)------“dong    dong    dong”(it  means  the  top  position  of  the  throttle  signal  is 
confirmed).Put the throttle to the bottom position and wait 2 seconds,then can hear again 
the  tone  of    “dong    dong    dong”(it  means  the  bottom  position  of  the  throttle  signal  is 
confirmed).At this moment,cut off the power ,the throttle setting have finished.
If haven't cut off the power,it will continue to enter other functions .
After  cut  off  the  power  of  ESC  and  put  the  throttle  to  the  bottom  position  ,the  ESC 
connection the power again,it means the ESC enter into the normal use.

Menu

1. Brake Setting

off/soft/hard

2.Timing

Low / Medium / High

Setting  is  according  to  poles  of  motor.Low  timing  value  for  2  poles  motor,For  higher 
speed ,Medium timing value be chosen.Medium timing value for motors with more than 
6 poles to get a high efficiency. For higher speed, High timing value can be chosen.When 
revision timing,it will cause current increase and ESC fever etc,pay much attention to the 
change of current value,avoid current overload,influence the life of motor and ESC.

3.Battery  Protection  Voltage  Threshold(Cut-Off  Threshold)

High  / 

Medium

  Default is Medium (suitable for Cell discharge);this function can calculate automatically 
the number of battery cells (7.4-16.8V)  and protection the discharge.Avoid to broken 
battery of discharge voltage too lower.
 High cut-off threshold:first stage is 3.2V/1cell;second stage is 3V/1cell
Medium cut-off threshold:first stage is 3V/1cell;second stage is 2.8V/1cell

 A-Li-Ion/Li-Po  High:when  single  voltage  of  Li-Po  down  to  3.2V,coming  into  the  first  stage 
production,motion  will  discontinue  indirection,for  this  moment,user  should  throttle  down 
and ready to land.when single voltage of Li-Po down to 2.9V,coming into the second stage 
production,full restriction the motion output.(Attn:Only in 4-1 option , the normal Fixed-wing 
will be start the second stage protection).
When  enter  into  the  first  stage,operator  should  land  the  plane  in  time,avoid  the  battery 
discharge in heavy and damage the battery.
Ex:when use 11.1V 3cell Li-po battery,the voltage protection should set High cut-off 
threshold.
   11.1V Li-po battery ,the full charged is 12.6V,the ESC is regarded as 3cells Li-po battery.
    Enter into the first stage protection voltage is 3.2V

3cell=9.6V ;

the second stage protection voltage is 2.9V

3cell=8.7V

When the voltage down to 9.6V,motion will discontinue indirection,when the voltage down 

to 8.7V,full restriction the motion output.

 
 

Attn

:Above  functions  are  suitable  only  to  the  Lithium  Batteries  with  enough 

3

Отзывы: