E09 TD-4100XD
Addendum: Clean-In-Place System
PN 106169
Rev B
E09 TD-4100XD Oil In Water Monitor
Clean-In-Place Addendum
A-5
A.1.2 MAKING PIPING CONNECTIONS
The cleaning solution pump and system is partially plumbed at the factory. Some assembly is required,
as detailed in
Section A.1 Installing the Clean-In-Place System
. To periodically drain the tank, Turner
Designs Hydrocarbon Instruments recommends installing a T-valve with hose bib at the CIP outlet
shown below and on page 1 of
Section A.5 Clean-In-Place General Arrangement Drawings
Rear view of monitor showing CIP system pump with
front panel removed.
CIP pump outlet. 1/2 in. MNPT. Install optional T-valve
and hose bib here for draining the CIP tank easily.
Right view of monitor showing CIP system outlet and
monitor sample return.
CIP pump outlet
Sample return (to process). 1 in. FPT.