background image

E09 TD-4100XD

Addendum:  Clean-In-Place System

PN 106169 

Rev B

E09 TD-4100XD Oil In Water Monitor 

Clean-In-Place Addendum

A-5

A.1.2 MAKING PIPING CONNECTIONS

The cleaning solution pump and system is partially plumbed at the factory. Some assembly is required, 

as detailed in 

Section A.1 Installing the Clean-In-Place System

To periodically drain the tank, Turner 

Designs Hydrocarbon Instruments recommends installing a T-valve with hose bib at the CIP outlet 

shown below and on page 1 of 

Section A.5 Clean-In-Place General Arrangement Drawings

.

Rear view of monitor showing CIP system pump with 

front panel removed.

CIP pump outlet. 1/2 in. MNPT. Install optional T-valve 

and hose bib here for draining the CIP tank easily.

Right view of monitor showing CIP system outlet and 

monitor sample return.

CIP pump outlet

Sample return (to process). 1 in. FPT.

Содержание TD-4100XD E09

Страница 1: ...ve questions regarding installation connections settings procedures or the general appearance of your monitor contact a service representative at Turner Designs Hydrocarbon Instruments Tel 1 559 253 1...

Страница 2: ...the electric actuator 7 Install the float valve switch into the 1 1 2 FNPT tank fitting a Remove the tank cover b Reach into the tank and remove the tank adapter nut by turning clockwise c Remove the...

Страница 3: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 3 Figure A 1 1 Monitor showing CIP installation points...

Страница 4: ...re directed to avoid cross contamination of fluids during the cleaning process During power failures valves will remain in their last state During start up after a power failure the valves will be dir...

Страница 5: ...m To periodically drain the tank Turner Designs Hydrocarbon Instruments recommends installing a T valve with hose bib at the CIP outlet shown below and on page 1 of Section A 5 Clean In Place General...

Страница 6: ...e outlet pipe Sample water inlet pipe Cleaning solution inlet pipe The monitor sample supply connection is described in Section 2 3 2 2 Installation Piping Connection The monitor sample return connect...

Страница 7: ...PWR and CIP pump I which use 5 A slow blow fuses The actuated valves are wired as follows 1 Black normally closed 2 Red normally open 3 White neutral 4 Green frame ground The main power terminal PWR i...

Страница 8: ...ump to access the wiring 4 Connect to the monitor using glands and cabling appropriate for your hazardous area requirements 5 Reverse these steps to return the pump to its mounted position Internal sw...

Страница 9: ...ribed in the following procedure The following procedures supplement the one described in Section 9 6 1 1 Online Cleaning which is specific to the flow cell rather than the entire sample system NOTE D...

Страница 10: ...4 You must set the interval of the cleaning as well as the units Use the key to change the units Finally you must set the cleaning sequence This is done by pressing 5 at the Cell Cleaning screen Press...

Страница 11: ...be at least 90 seconds to allow the bubble trap to fill and the pressure sensor to trigger the AVS To manually start the automatic cleaning cycle WARNING Always secure the cover on the cleaning soluti...

Страница 12: ...oses The recommended duration for this setting is 15 seconds At this point in the process all valves are closed and the cleaning solution can be pumped through the system The recommended run time for...

Страница 13: ...e cleaning solution has drained back into the cleaning solution tank all of the actuated valves have returned to their default positions and monitoring continues as normal Any step in the cleaning pro...

Страница 14: ...o operate until empty Flush if necessary Turn off power and uncouple power line to pump Remove pump from the mounting Carry out all repair work with extreme cleanliness Turner Designs Hydrocarbon Inst...

Страница 15: ...obstruct the movement of internal parts No fluid in tank Check the fill level on the side of the cleaning solution tank Make sure it is filled to a minimum of 5 U S gal 19 L Blown fuse Replace the pu...

Страница 16: ...4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B A 5 CLEAN IN PLACE GENERAL ARRANGEMENT DRAWINGS The CIP general arrangement drawings include multiple system views monitor installa...

Страница 17: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 17...

Страница 18: ...Addendum Clean In Place System E09 TD 4100XD A 18 E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B...

Страница 19: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 19...

Страница 20: ...Addendum Clean In Place System E09 TD 4100XD A 20 E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B...

Страница 21: ...an In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 21 A 6 E09 TD 4100XD GENERAL ARRANGEMENT DRAWINGS This drawing set replaces those shown in Chapter 11 Ge...

Страница 22: ...Addendum Clean In Place System E09 TD 4100XD A 22 E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B...

Страница 23: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 23...

Страница 24: ...Addendum Clean In Place System E09 TD 4100XD A 24 E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B...

Страница 25: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 25...

Страница 26: ...Addendum Clean In Place System E09 TD 4100XD A 26 E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum PN 106169 Rev B...

Страница 27: ...E09 TD 4100XD Addendum Clean In Place System PN 106169 Rev B E09 TD 4100XD Oil In Water Monitor Clean In Place Addendum A 27...

Отзывы: