Guidelines for Station Planning
D301087 1211 - BL20 CANopen
6-10
C-rails can be used for a common voltage supply when relay modules are planned. To accomplish this,
the load voltage is connected to a Power Feeding module with the BL20-P4x-SBBC base module with
tension clamp or screw connection. All the following relay modules are then supplied with power via
the C-rail.
Cross-connecting relay module roots is achieved by the use of jumpers. The corresponding wiring
diagram including the jumpers can be found in chapter 4.
6.2.6
Direct Wiring of Relay Modules
As well as the options mentioned above, relay modules can be wired directly. In this case, base modules
without C-rail connections should be chosen to guarantee the potential isolation to the adjoining
modules.
Figure 6-6:
Using the C-rail as
a protective earth
Attention
When relay modules are planned and the C-rail is used for a common voltage supply, a further
power distribution module must be used for the potential isolation to the following modules.
The C-rail can only again be used as a PE following potential isolation.
Figure 6-7:
Using the C-rail as
protective earth
and for the power
supply with relay
modules
23
22
21
13
12
11
23
23
22
22
21
21
13
13
12
12
11
11
23
23
23
22
22
22
21
21
21
13
13
13
12
12
12
11
11
11
24
24
23
23
22
22
21
21
14
14
13
13
12
12
11
11
24
23
22
21
14
13
12
11
24
23
22
21
14
13
12
11
Gateway
TS
BR
SBBC
2 DO
SBC
2 DI
SBBC
2 DO
SBC
2 DI
SBB
PF
SBBC
2 DI
2 DO
SBBC
SBC
2 DO
SBC
2 DI
SBB
C-rail (PE)
C-rail (PE)
PE
terminal
Gateway
23
22
21
13
12
11
23
23
22
22
21
21
13
13
12
12
11
11
24
24
23
23
22
22
21
21
14
14
13
13
12
12
11
11
24
23
22
21
14
13
12
11
24
23
22
21
14
13
12
11
24
23
22
21
14
13
12
11
24
23
22
21
14
13
12
11
24
23
22
21
14
13
12
11
yy
y
TS
Gateway
PE
terminal
BR
SBBC
2 DO
SBC
2 DI
SBBC
2 DO
SBC
2 DI
SBB
PF
NC
NO
SBCS
SBCS
NO
SBCS
NC
SBCS
C-rail (24 V DC)
C-rail (PE)
SBBC
Содержание BL20-GW-CANOPEN
Страница 1: ...BL20 USER MANUAL FOR CANopen...
Страница 4: ......
Страница 8: ...D301087 1211 BL20 CANopen iv...
Страница 14: ...About this Manual D301087 1211 BL20 CANopen 1 6...
Страница 24: ...BL20 Philosophy D301087 1211 BL20 CANopen 2 10...
Страница 54: ...BL20 Communication in CANopen D301087 1211 BL20 CANopen 5 2...
Страница 68: ...Guidelines for Station Planning D301087 1211 BL20 CANopen 6 14...
Страница 82: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 2...
Страница 83: ...D301087 1211 BL20 CANopen 8 3...
Страница 84: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 4...
Страница 85: ...D301087 1211 BL20 CANopen 8 5...
Страница 86: ...BL20 Approvals for Zone 2 Division 2 D301087 1211 BL20 CANopen 8 6...
Страница 92: ...Glossary D301087 1211 BL20 CANopen 9 6...
Страница 94: ...Index D301087 1211 BL20 CANopen 10 2...