44
MANCHESTER SERIES Rigging Manual
6
7
4
8
1
1
9
12
11
10
10
5. Prepare the first MV212 cabinet, by pulling out the front lower rigging pins
(6), and the rear lower rigging pin (7).
6. Carefully lift the MV212 cabinet until its lower front mounting slots fit over
the 2 front links (1) of the MAN-FG fly grid. Reinsert the front pins (6) to
secure the MAN-FG fly grid links (1) to the MV212.
Take care not to trap your fingers between components.
7. Align the MV212 cabinet's rear lower mounting hole with the top hole (8) in
the ground stack plate (4). Reinsert the rear pin (7) to secure the rear of the
MV212 to the ground stack plate.
Double check that all pins are correctly inserted,
before proceeding further.
8. Prepare the lower MV212 for the next MV212 cabinet, by pulling out the 2
front upper rigging pins (9). The spring-loaded top links (10) will move to the
up position. Reinsert the pins (9) to secure the links in the up position.
9. Pull out the rear upper rigging pin (12), and slide the MV212's rear mounting
plate (11) upwards and reinsert the rigging pin (12) into one of the available
holes. Each hole is marked with an angle; choose the hole which matches
the angle you want to set the next MV212.
Содержание MAN-FG
Страница 54: ......