![turbionaire 5949096154172 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/turbionaire/5949096154172/5949096154172_instruction-manual_1180793011.webp)
INSTALLATION
4.1.2 Fix the bolts in the proper position
(fix the position with the mounting plate
and pour cement into the bolt holes.)
A.
Installing on the concrete wall:
4.1.1 Removed the mounting plate
Remove the plastic parts, unclamping the
fixed screws on the back of main body to
remove the mounting plate.
4.1.3 When the cement has freeze,
fit the mounting plate (use the
washer and nut according to the
following)
4.1.4 Install the main body
Set the main body onto the upper end of the
mounting plate, and clamp it as below. Make
sure it’s well fixing
1
2
MOUNTING PLATE
2
1
PLASTIC PARTS
Содержание 5949096154172
Страница 2: ......
Страница 29: ...PARAMETRII TEHNICI TRIFAZIC H high nivel ridicat L low nivel sc zut CARACTERISTICILE LINIEI ELECTRICE...
Страница 37: ...TECHNISCHE PARAMETER DREIPHASIG H high hohes Niveau L low niedrigeres Niveau MERKMALE DER ELEKTRISCHEN LEITUNG...
Страница 45: ...PARAM TRES TECHNIQUES TRIPHAS CARACT RISTIQUES DE LA LIGNE LECTRIQUE H high haut niveau L low bas niveau...
Страница 53: ...PAR METROS T CNICOS TRIF SICA H high nivel alto L low nivel bajo CARACTER STICAS DE LA L NEA EL CTRICA...
Страница 68: ...PARAMETRI TECNICI TRIFASE H high livello alto L low livello basso CARATTERISTICHE DELLA LINEA ELETTRICA...
Страница 71: ......
Страница 72: ...www turbionaire com...