Tunkers Liliput 500 Скачать руководство пользователя страница 13

 

 

13 

 

 

 

7. Troubleshooting  

7.1 

– Coating failure 

Be sure to properly fit the adjusting ruler (14) up to the end of the lateral slot of 
the machine. Then, check if the coating failure remains. If not, check if the glue 
film is thick enough using knob (13). If the end edge of the sheet does not show 
a  proper  coating,  then  grab  the  leading  edge  as  it  exits  and  guide  it  back 
towards the front of the machine.    

7.2 

– If paper tears 

Make sure stripper fingers are properly positioned. Remove all stripper fingers 
from the shaft and adjust their height. If they are slightly worn, loosen and rotate 
them a bit or replace the blades. 

7.3 

– Motor is not rotating or is running slowly 

Ensure  the  power  cable  is  properly  connected  and  the  electrical  supply  is 
getting to the wall socket.  

If no light is on, check fuses. When blown, replace it 5A 

In other cases, call a qualified electrical technician. 

7.4 

– Sheet loaded into the machine. 

Make sure the stripper fingers are assembled or properly positioned to prevent 
this to happen. 

Stop the motor, and slowly turn the roller counter-clockwise, through the shaft 
11a, as shown. To pick-up the sheet, lead it out manually. 

 

Содержание Liliput 500

Страница 1: ...1 Liliput 500 Glue machine...

Страница 2: ...cable Regulations for Accident Prevention and Environmental Protection They must always be at hand on site when the machine is being used This guide must be read and observed by all operators dealing...

Страница 3: ...ductivity 7 3 Legends and Descriptions 8 4 Assembly and Operation 10 5 Operating the machine 11 6 Maintenance 12 7 Troubleshooting 13 8 Cardboard Attachment 14 9 Glue coating on edges and in strips 15...

Страница 4: ...lfunction that may affect safety is immediately solved This machine is exclusively designed for glue coating Any other use is not deemed appropriate and the manufacturer is not liable for damages or a...

Страница 5: ...d instructor with clearly defined qualification for operation assembly maintenance and repair of the machine Make sure only authorized personnel have permission to operate the machine Electrical maint...

Страница 6: ...achine operation production assembly or setup including its safety features such as inspection and maintenance Consequently downtime and operation activities described in this guide must always be obs...

Страница 7: ...of water based cold and hot glue or latex are possible The amount of glued sheets directly depends on its size length on the speed setup in the machine and on the speed operators are handling the equi...

Страница 8: ...12a The coating scraper grabs transferring the adhesive from the tray to the coating roller 12 To increase or thin out coating thickness rotate knob 13 which will in turn lift or lower the coating scr...

Страница 9: ...12a you will find shields 16 and 16a with seals Shields to prevent an accumulation of adhesive on rolls that might damage coating rollers ______________________________________________________________...

Страница 10: ...perly and are noise free When motor is purchased as an optional component make sure the network supports the motor data recorded during its setup or assembly Local conditions must be considered in det...

Страница 11: ...esive in the first rotations first starting minutes and not interfering with coating rollers proper rotation Note Tray 18a must be filled with water 2 3 times a day Make sure the water does not evapor...

Страница 12: ...lete cleaning procedures 6 1 Cleaning procedures After working process is complete a full cleaning procedure is required as described below While motor is in operation at low speed dislodge the trays...

Страница 13: ...emove all stripper fingers from the shaft and adjust their height If they are slightly worn loosen and rotate them a bit or replace the blades 7 3 Motor is not rotating or is running slowly Ensure the...

Страница 14: ...attachment is purchased separately pulley 22 must be assembled on top of the shaft by the user Pulley and attachment as well as belt must be delivered all at the same time 8 2 Knob 25 controls pressur...

Страница 15: ...ssembly of shaft 33 on top of which connecting rods 34 are mounted Connecting rods and its rollers must be assembled only on supporting rings 31b to increase sheet pressure against gluing rings and en...

Страница 16: ...ng Pump The dosing pump assures controlled water supply to the animal glue tray Due to machine s layout the glue in the animal glue tray is constantly moving and getting in contact with heat and dry a...

Страница 17: ...ted in order to approve viscosity c Start working normally coating nonstop d Unmelted glue must start constantly being added while the machine is running Since there are different types of adhesives d...

Отзывы: