background image

 

 

M a n u a l   P / N   6 4 8 5 - 0 0 5 ,   RE V   C

PG E

                                         

  

Page 

6

 

 

 

Figure 4: Rearming simulated oxygen cylinder 

 

3.4.

 

Repacking 

The PBE should be folded in half and placed inside the re-usable pouch with the hook and loop 

strip sealed along the top of the pouch to prepare for the next use. If you do not have the re-

usable pouch, you can skip this step. 

4.

 

CARE AND BASIC MAINTENANCE 

4.1.

 

Storage 

The PBE should be stored in the re-usable pouch to protect it from damage, as described above. If 

you do not have the re-usable pouch, the folded PBE can be placed in a 16” by 20” re-sealable plastic 

bag.

 

4.2.

 

Cleaning 

4.2.1.

 

Disassembly 

1.

 

Detach the cord from the hood by first removing the actuation clips from the simulated 

oxygen simulators. 

a.

 

For the pull ball 

configuration, undo the hitch 

attaching the cord to the 

front of the hood. 

b.

 

For the Essex standard 

configuration, undo the two 

split rings attaching the cord 

to the sides of the hood. 

2.

 

Undo the hook and loop fastener and remove the two simulated O

2

 cylinders. 

3.

 

Remove the neck seal by undoing the hook and loop fastener strip used to fasten it in 

place. 

Содержание 6485-001

Страница 1: ...P N 6485 005 REV C USER MANUAL ESSEX TRAINING PBE P N 6485 001 6485 006 TULMAR SAFETY SYSTEMS Inc 1123 Cameron Street Hawkesbury Ontario Canada K6A 2B8 Tel 1 613 632 1282 Fax 1 613 632 2030 www tulma...

Страница 2: ...3 2 Safety Precautions 4 3 Operation 4 3 1 Training Procedure 4 3 2 Disinfection 5 3 3 Rearming 5 4 Care and Basic Maintenance 6 4 1 Storage 6 4 2 Cleaning 6 4 2 1 Disassembly 6 4 2 2 Cleaning and Dr...

Страница 3: ...it will experience during repeated use in a training environment The actuation clips can be reset without the need for tools and the device can be completely dismantled for easy cleaning between uses...

Страница 4: ...do not have the re useable pouch you can skip this step 2 Remove the hood from its packaging and unfold 3 Simulate the activation of the oxygen cylinders a For the pull ball configuration 6485 001 hol...

Страница 5: ...emove the device by grabbing the back of the hood and pulling forwards off your head 3 2 Disinfection The neck seal and facial contact area in the front of the hood should be disinfected with alcohol...

Страница 6: ...as described above If you do not have the re usable pouch the folded PBE can be placed in a 16 by 20 re sealable plastic bag 4 2 Cleaning 4 2 1 Disassembly 1 Detach the cord from the hood by first rem...

Страница 7: ...4 2 3 Reassembly Once completely dry the unit can be reassembled 1 Insert the neck seal into the opening and fasten the hook and loop fastener strip along its perimeter Be sure the hole in the neck se...

Страница 8: ...lanyard hitch knot b For the Essex standard configuration attach the cord to the two small fabric loops at either side of the hood using the split rings 4 Rearm the simulated oxygen cylinders as descr...

Страница 9: ...Number Figure 7 Part No Description 1 6412 001 Non latex neck piece Not shown 6412 NP Latex neck piece by special order only Not shown 6445 001 Re useable pouch 3 6485 003 Cord assembly with clips pul...

Страница 10: ...r damage during transport of the product ordinary wear and tear arising from use of the product or damage that may arise from accidental or intentional misuse or abuse alteration or customization or r...

Страница 11: ...page s affected and a brief description of the change REV Date Pages Affected Brief Description A December 8th 2016 All Initial release B April 17th 2017 All Complete Manual Revision post product modi...

Отзывы: