2.The tool jack
①
Periodically with a cotton swab and so remove the dirt inside the
tool jack.
②
After service must check whether the blade fixing screws tighten.
Страница 1: ...temperature 5 40 Degrees Celsius 9 The Configuration List Std Replacement Blade 5PC L shaped Blade 1PC Allen Wrench 1 5mm for M3 0 1PC Screw for Mounting Blade M3 3L 2PC 110 V to 220 V voltage adapte...
Страница 2: ...ke farewell electrically heated iron utility knives drills and other tools 6 Flexible very suitable for operation in small places 7 Safety contact point switch make you more safe operation For your ef...
Страница 3: ...could lead to melt or char rather than cutting things 5 Circuit Protection the host set the automatic temperature protection system when the host inside reaches 70 circuit protection system will autom...
Страница 4: ...lade with wrench you can not wring once in the end many times the appropriate efforts to tighten use excessive force to tighten the screws will reduce the life of the screws and clamps 3 Use the cable...
Страница 5: ...omenon just off the host switch wait the handle about 10 minutes to cool you can continue to use If they continue to work in the case of heat it can cause burns but also to damage the handpiece About...
Страница 6: ...2 The tool jack Periodically with a cotton swab and so remove the dirt inside the tool jack After service must check whether the blade fixing screws tighten...