Setting and attaching lockers:
Once you have prepared and inspected the area, and installed the bases
(if supplied), you are ready to begin setting lockers. If the lockers are being
installed without a base, check the floor space and locate the high and low
spots. Use this point as a reference to ensure the lockers will sit level after
installation, use shimming as required. The layout drawings provided show
the “bank configuration” (see below). Use this to determine the location of
the different banks on the job.
Locate the bank required for this area. Place the
bank into position, and check for fit. Make sure that
the bank is set square and level. This is crucial since
you will be attaching the next banks to this first one.
Anchor the bank into position using the 1 3/4"
tapcon screws provided. The bank will be attached
to the wall at the four corners, pre-drill 1/8" hole,
approximately 3" down and 3" over. Do NoT
over tighten these screws at this time, just tighten
enough to hold the bank into position.
Attach the locker to the base (if supplied) at the
front. Secure using the 1 1/2" torx head fasteners
provided.