TuffStuff TG-11L Скачать руководство пользователя страница 3

TG-11L  Leg Press (Option) 

  

   2 

Owners’ Manual: Assembly Instructions 

FIG. A    

 

    

Attach the TG-11L to the TG-150, as shown above, and 

secure it into using two Hex Head Cap Screws 3/8-16 X 3 3/4 (#15), four 
Flat Washers SAE 3/8 (#23) and two Nylon Insert Jam Lock Nuts 3/8-16 
(#25). When installing the TG-11L you will receive a new cable,  the 

Main 

Cable (#16-Labeled with tape TG-150)

. This 

Main Cable (#16-Labeled 

with tape TG-150)

 will replace the existing cable you are using for the 

Leg Extension station on the TG-150. This new 

Main Cable (#16-Labeled 

with tape TG-150) 

will now be used for the Leg  Extension and the Leg 

FIG. 2     

 Attach three Nylon Pulleys 4 1/2 Rd. (#30) ,as shown above. 

Attach two of the Nylon Pulleys 4 1/2 Rd. (#30) to the brackets located 
on the

  Fulcrum (#1)

 

and then one on the 

Main Frame (#2)

. Secure all 

Nylon Pulleys 4 1/2 Rd. (#30) into place using three Hex Head Cap 
Screws 3/8-16 X 1 3/4 (#18), six Flat Washers SAE 3/8 (#23) and three 
Nylon Insert Jam Lock Nuts 3/8-16 (#25). Next, insert the 

Small Axle 

(#9)

 

into the 

Main Frame (#2)

. Then mount the 

Fulcrum (#1)

 onto the 

front  of the 

Main Frame (#2) 

and secure it into place using one Hex 

Head Cap Screw 1/2-13 X 5 1/2 (#14),  two Flat Washers SAE 1/2 (#22) 
and one Nylon Insert Jam Lock Nut 1/2-13 (#20) . Next, insert the

  Foot 

Plate (#4) 

onto the

 Fulcrum (#1)

, as shown above, with the 

Large Axle 

(#5) 

and secure it into place using two Set Screws 3/8-16 X 1/2 (#12). 

Note

:  It is recommended to lubricate the axles using a multi-purpose 

Fig. 3   

Note

: Before routing the cable, locate the

 Main Cable (#16-

Labeled with tape TG-150)

 or the 

Main Cable (#31-Labeled with 

tape TG-250)

.  The label on the cable will determine which cable is 

needed for either the TG-150 or the TG-250. 

Route the 

Main Cable 

(#31 or #16)

, as illustrated above, beginning at the TG-150 or TG-250 

and finishing at the 

Fulcrum (#1)

 

mounting  bracket. Secure the 

Main

 

Cable (#31 or #16)

 

to the 

Fulcrum (#1) 

mounting bracket using one 

Hex Head Cap Screw 1/2-13 X 1 (#21), two Flat Washers SAE 1/2 
(#22) and one Nylon Insert Jam Lock Nut 1/2-13 (#20). 

Note

: Use 

Fig. 

and

  Fig. B

  and your TG-150 Or TG-250 Instruction Manual for 

further clarification of the this cable routing.

 

 

       

FIG. B    

 

    

Attach the TG-11L to the TG-250, as shown above, and 

secure it into place using two Hex Head Cap Screws 3/8-16 X 3 3/4 (#15), 
four Flat Washers SAE 3/8 (#23) and two Nylon Insert Jam Lock Nuts 3/8
16 (#25). When installing the TG-11L you will receive a new cable, 

Main 

Cable (#31-Labeled with tape TG-250)

. This

 Main Cable (#31-Labeled 

with tape TG-250) 

will replace the existing cable you are using for the 

Low Row station on the TG-250. This new 

Main Cable (#31-Labeled with 

tape TG-250) 

will now be used for the Low Row and the Leg Press 

                 

  

Note:

 

Some Parts Not 

Shown or cut away  for 
clarity

 

 Fig. B  

TG-11L to TG-250  

Cable Routing Diagram 

 Fig. A 

TG-11L to TG-150  

Cable Routing Diagram 

Отзывы: