
Eco Sweeping Machine
19
.4.1 Transport trips
The safety instructions in Chapter 3.3 are
mandatory!
Transport trips may only be made with an
empty dirt collection vessel.
Safeguard the operating elements for the
sweeping machine against unintended use.
• For open sweeping usage, the sweeping machine must
be positioned straight, see Chapter 3.4.7 Side adjust-
ment for open sweeping.
• Lift sweeping machine out.
.4.2 Start-up
The safety instructions in Chapter 3.3 are
mandatory!
• For open sweeping usage, shift the two supports at the
sweeping machine frame upwards and secure them.
• The maximum driving and sweeping speed is 6 km/h.
• When operating the sweeping machine, a sweeping
profile of 6 - 10 cm appears. (for adjustment of the
sweeping profile see Chapter 3.4.8).
• Hydraulic hoses must be positioned without danger of
getting squashed (see initial attachment in Chapter 3.3).
Sweeping machine - Position in front of
the carrier vehicle
• Lower the sweeping machine until the two (or three) cas-
tor wheels touch the ground.
• Place the receptacle structure perpendicular to the
ground.
• All attachments, except for the 3-point linkage, are deli-
vered with level compensation.
• Vertically move the sweeping machine with level com-
pensation until the attachment is in the middle of the
height compensation.
.4. Rpm adjustment
The revolution speed is adjusted via the oil power of the
carrier vehicle. This depends on the type of the carrier ve-
hicle and its equipment.
ATTENTION
NOTE
Содержание Eco 150
Страница 1: ...Eco Sweeping Machine Operating Manual ...