-9-
Prior to Operation
(1) Once again, check the nameplate of the pump to verify that its voltage and frequency
are correct.
CAUTION
Improper voltage and frequency of the power supply will prevent the pump
from attaining its full potential, and may also damage the pump.
Note:
Verify the specs on the pump's nameplate.
(2) Check the wiring, power supply voltage, the capacity of the ground leakage circuit
breaker, and the insulation resistance of the motor.
Insulation resistance reference value = 20MΩ minimum
Note:
The insulation resistance reference value of 20MΩ minimum is based on a new or repaired
pump. For reference values of a pump that has already been put into operation, refer to
"Maintenance and Inspection".
(3) Adjust the setting of the thermal relay (i.e. 3E relay) to the pump's rated current.
Note:
Verify the rated current on the pump's nameplate.
Trial Operation
WARNING
Never start the pump while it is suspended, as the pump may jerk and cause
a serious accident involving injury.
(4) When using a generator, as much as possible avoid operating the pump in conjunction
with other types of equipment.
COUNTERMEASURE
Interchange any two of the three wires designated U, V, and W,
respectively.
(1) Operate the pump for a short time (1 to 2 seconds) and verify the direction of the rota-
tion of the impeller. Observe the pump unit from above, and if its recoil is in the coun-
terclockwise direction, the direction of its rotation is correct.
CAUTION
Make sure to check the pump's direction of rotation with the pump exposed
to the atmosphere. Operating the pump in reverse while it is submerged in
water will damage the pump, which may lead to current leakage and electrical
shock.
(2) To reverse the rotation, the following countermeasures must be taken.
WARNING
Before changing the connections for reverse rotation, make sure that the
power supply (i.e. circuit breaker) is properly disconnected and that the
impeller has stopped completely. Failure to observe this may lead to electrical
shock, short, or injury.
Note:
(1) and (2) are applied to the three-phase pumps.
Example:
U
V
W
G
Interchanging
phases V and W
Ground
6 OPERATION
Содержание LB-250
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......