- 5 -
6. Installation
6. Installation
6. Installation
6. Installation
6.1 Installation environment
Install the Shock Monitor in a place where the following conditions are satisfied:
・
Location where the ambient temperature is between 0 to 50°C and the Shock
Monitor is not exposed to direct sunlight
・
Location where the relative humidity is between 45 to 85%, no condensation or
freezing occurs, and no water splashes onto the Shock Monitor
・
Location where no dust, corrosive gases, or oil mist exist
・
Location where the altitude is 1000 m or less and vibration is 4.9 m/s
2
or less
6.2 Mounting orientation and space
・
Mounting method
Insert M4 screws into the DIN rail or the mounting holes
of the socket and attach the main unit. Mount the Shock
Monitor so that its panel is oriented vertical to the ground.
Mounting it upside down or horizontally may cause
overheating and breakdown.
・
Space
To ensure the dissipation of the
heat generated from the Shock
Monitor, provide spaces as shown in
the figure on the left from other
equipment, walls, and wiring ducts.
・
Panel mounting type (TSM4000M2P)
Mount the Shock Monitor as shown
in the figure on the right.
Tighten the fixing screw with the tightening torque of 0.12
to 0.16 N
・
m. Provide a space of 50 mm or more above the
main unit housing to allow access to the lock.
■ Do not allow the entry of foreign matter such as lint,
paper pieces, woodchips, dust, or metal chips into the
Shock Monitor.
Otherwise, a fire or accident may result.
Otherwise, a fire or accident may result.
Otherwise, a fire or accident may result.
Otherwise, a fire or accident may result.
7. Wiring
7. Wiring
7. Wiring
7. Wiring
①
Complete wiring by using only the socket before attaching the Shock Monitor main
unit to the socket.
②
Connect a commercial power supply of 90 to 250 VAC, 50/60Hz or a DC power supply of 90
to 250 VDC (no polarity) to the POWER terminals (11 and 12
)
. Do not connect the output
from an inverter or a servo driver. An erroneous connection as such may cause breakdown.
③
Use a ring type crimp terminal shown on the right to connect the power supply cable
and the terminal block for wiring.
Limit the tightening torque to 0.5 to 0.6 N•m.
④
When the connection (wiring) is completed, check the following:
a. Are the wires connected properly?
b. Are there any remaining disconnected wires?
c. Are there any short-circuits or ground fault conditions occurring between terminals or wires?
⑤
After the connection is complete, fully insert the main unit to the socket until the
hooks lock securely.
● Be sure to ground the grounding wire.
Otherwise, an electric shock or fire may result.
Otherwise, an electric shock or fire may result.
Otherwise, an electric shock or fire may result.
Otherwise, an electric shock or fire may result.
● The wiring must be done by an electric work specialist.
● Confirm that the power is turned off before start
wiring work.
Otherwise, an electric shock may result.
Otherwise, an electric shock may result.
Otherwise, an electric shock may result.
Otherwise, an electric shock may result.
C
o
n
te
n
ts
U
s
a
g
e
/N
a
m
e
s
S
a
fe
ty
In
st
al
la
tio
n
In
st
al
la
tio
n
In
st
al
la
tio
n
In
st
al
la
tio
n
/W
ir
in
g
/W
ir
in
g
/W
ir
in
g
/W
ir
in
g
T
er
m
in
a
ls
C
on
n
ec
tio
n
O
p
e
r
a
ti
o
n
M
ai
n
te
n
an
ce
/In
sp
ec
tio
n
Sp
ec
ifi
ca
tio
ns
D
im
en
si
on
s
W
a
r
r
a
n
ty
!!!!
CAUTION
!
!
!
!
WARNING
Panel
Recommended panel
thickness: 2 to 5 mm
Lock
Fixing screw
10 cm
10 cm
1
c
m
1
c
m
Top
Top
Top
Top
Bottom
Bottom
Bottom
Bottom
6.5 mm
or less
3.2 mm dia.
O U T 1 O U T 2 O U T 3
Содержание TSM4000M2
Страница 27: ...MEMO MEMO MEMO MEMO...