- 19 -
Example timing chart for the tool abrasion detection using the integral power monitoring
C
o
n
te
n
ts
U
s
a
g
e
/N
a
m
e
s
S
a
fe
ty
In
st
al
la
tio
n
/W
ir
in
g
T
er
m
in
a
ls
C
on
n
ec
tio
n
O
p
e
r
a
ti
o
n
O
p
e
r
a
ti
o
n
O
p
e
r
a
ti
o
n
O
p
e
r
a
ti
o
n
M
ai
n
te
n
an
ce
/In
sp
ec
tio
n
Sp
ec
ifi
ca
tio
ns
D
im
en
si
on
s
W
a
r
r
a
n
ty
ON
RUN indicator
ON
E
le
ct
ri
c
p
o
w
e
r
X1 input
Start Time
1s
OUT1 Setting level
(Integral power lower limit)
OUT1 output relay
In
te
g
ra
l
p
o
w
e
r
When parameter 3:
Integration Time is set to
X1
ON(0.1 s min.)
ON
OUT2 Setting level
(Integral power upper limit)
RUN indicator
OUT2 output relay
ON
Parameter 3
:
Integlation TIme
Setting time
E
le
ct
ri
c
p
o
w
e
r
X1 input
Start Time
1s
In
te
g
ra
l
p
o
w
e
r
When parameter 3:
Integration Time is set to
0.1 to 25 s
Integral power upper limit output
Integral power lower limit output
Auto-Reset operation
Auto-Reset operation
Содержание TSM4000M2
Страница 27: ...MEMO MEMO MEMO MEMO...