background image

 

 

10 

 

13. Maintenance and testing 

During performance of any maintenance or testing, be sure to go the following. 

(1)  To prevent a fire hazard, keep the surrounding area clean and create a safe environment. 
(2) When  performing  tests  on  the  Shock  Relay  mounting  or  connections,  be  sure  that  the  power    

supply  is  disconnected,  that  the  instrument  is  completely  stopped,  and  that  “MON”  lamp  isn’t 
turned on. Also, make sure that the power supply cannot be accidentally reconnected. 

(3) Observe the guidelines listed in the Labor Safety and Health Regulation.

 

 

14. Daily check and periodic check 

(1) Confirm  that  there  is  no  looseness  in  the  installation  of  the  Shock  Relay  and  current 

transformer.  Check the wiring connections every six months. 

(2) Regularly check the function of the output relay, terminal 95-96, terminal 97-98, by pressing 

the TEST button. 

(3) A typical life time of electrolytic capacitor mounted in the SHOCK RELAY is about 10 years at 

an average ambient temperature of 30

, but this lifetime may vary with a different ambient 

environment and with the operating period when power is supplied. We recommend you to 
exchange the Shock Relay for a new one before trouble occurs. 

 

15. Point for safe use 

(1)  Take measures beforehand to prevent danger when using a TSUBAKI product. 

(2) 

If  our  product  begins  to  operate  improperly,  be  sure  to  take  measures  to  prevent  a 
dangerous situation from arising.

 

 

16. Guarantee.  

 Range of guarantee  

With regard to any troubles happened to our products, replacement or repair of such troubled 
parts will be provided for free of charge during the effective period of guarantee, provided that 
installation  and  maintenance/management  of  said  products  have  been  performed  properly 
pursuant to the description of this instruction manual and said products have been used under 
the condition described in the brochures or agreed separately through mutual consultations.  
The  content  of  guarantee  is  limited  only  to  the  Shock  Relay  itself  delivered  to  you  and  the 
judgment thereof will be made by our selection because such judgment pertaining to the range 
of guarantee is often complex.  

 Guarantee period 

The guarantee period shall be either 18 months after shipment from our factory or 12 months 
after starting operation, whichever is shorter. Any and all inspection/repair undertaken by us 
after the above guarantee period has passed will be charged.   Should questions arise, please 
do not hesitate to contact us or the dealer from whom you purchased.  

 Miscellaneous 

(1) Any matters described in this instruction manual are subject to change without notice.  
(2) We  have  tried  our  best  in  preparing  the  contents  of  this  instruction  manual.    Should  any 

mistake or oversight be found, we will be more than happy if you would advice us of them.

 

 
 
 
 
 
 
 
 
 
 
 

Содержание SHOCK RELAY TSB2CT Series

Страница 1: ...Edition When revisions of these standards are published the updated edition shall apply 6 Guards must be provided on all power transmission and conveyor applications in accordance with provisions of...

Страница 2: ...ation to adjustment Be sure to read this manual carefully before using your Shock Relay When delivering a device containing the Shock Relay be sure that this instruction manual is included 2 TSBSA and...

Страница 3: ...2 3 Dimensions Shock relay Attachment Cover Screw Unit mm 1inch 25 4 mm...

Страница 4: ...3 External 2 phase CT Details for installation holes...

Страница 5: ...Over 10M with 500 VDC Megger Between casing and circuit AC 2000V 5mA 60Hz 1min Between contacts AC 1000V 5mA 60Hz 1min Dielectric Strength Between circuits AC 2000V 5mA 60Hz 1min 115VAC 2 70 VA 0 35W...

Страница 6: ...n of the arrow to remove the mounting bracket 2 Install the Shock Relay to the DIN rail 6 Wiring 1 Connect 90 250VAC power source to the terminal A1 A2 Never connect the output of an inverter or a ser...

Страница 7: ...1 2 2 3 TSBSA10 1 2 2 3 TSBSA05 1 3 7 5 TSBSA30 3 7 5 TSBSA10 1 5 5 7 1 2 TSBSA30 1 5 5 7 1 2 TSBSA30 1 7 5 10 TSBSA60 1 7 5 10 TSBSA30 11 15 TSBSA60 1 11 15 TSBSA30 1 15 20 TSBSA60 1 18 5 25 TSBSA60...

Страница 8: ...urrent 100A 200A 300A Ratedsecondarycurrent 5A Ratedburden 5VA Ratedfrequency 50 60Hz Approximatelyweight 0 5kg Installation Procedure 1 Install the SHOCK RELAY on the External CT with screws accordin...

Страница 9: ...y has elapsed Shock Relay will return to normal condition MON lamp green shows monitor condition It is turned on under the normal monitor condition and the relay turns off the lights while it is outpu...

Страница 10: ...he running current is commonly used 6 Reset the START TIME knob to match the normal run up time 7 Periodic testing by using the TEST button is suggested to ensure the full protection through preventiv...

Страница 11: ...product begins to operate improperly be sure to take measures to prevent a dangerous situation from arising 16 Guarantee Range of guarantee With regard to any troubles happened to our products replac...

Страница 12: ......

Отзывы: