background image

 

51 

Appendix C

 

 
 
LCIE ATEX Certificate of Compliance 

 

 

Содержание SIDEPAK SP330

Страница 1: ...E x p o s u r e M o n i t o r i n g Models SP330 SP350 SIDEPAK Personal Sampling Pumps User Guide 1980454 Revision F February 2009 SP330 SP350...

Страница 2: ...arranties and is subject to the LIMITATIONS stated herein NO OTHER EXPRESS OR IMPLIED WARRANTY OF FITNESS FOR PARTICULAR PURPOSE OR MERCHANTABILITY IS MADE TO THE EXTENT PERMITTED BY LAW THE EXCLUSIVE...

Страница 3: ...NiMH Battery Maintenance 12 Getting Started 12 Charging Procedure 13 Storage of NiMH Battery Packs Between Uses 14 Installing the NiMH Rechargeable Battery Packs 14 Installing the AA Battery Pack 15...

Страница 4: ...clone 33 Pump Service Kit for the SIDEPAK SP330 SP350 34 Changing the Inlet Filter 34 CHAPTER 5 TROUBLESHOOTING 37 APPENDIX A SPECIFICATIONS 41 ATEX Rating SP330 with 801723 801738 and 801729 Battery...

Страница 5: ...e for assessing determining and following appropriate and applicable health and safety practices and compliance regulatory limitations before using these products The information contained in this doc...

Страница 6: ...ory 1 Flammable materials always present G Gas rating for use in gas vapor or mist atmospheres EEx ia Intrinsic safety Zone 0 1 2 flammable material hazards always present 1000 hr yr IIC Apparatus gro...

Страница 7: ...Rating Information TSI Battery Pack P Ns 801722 801724 801728 or 801729 INTRINSICALLY SAFE CSA Exia T2A with 801724 or 801729 T2C with 801722 or 801728 Class I Groups A B C D Class II Groups E F G Cla...

Страница 8: ......

Страница 9: ...photos and accessory descriptions below to determine which components are included with the kit or single unit you purchased If any parts are missing contact TSI immediately SIDEPAK SP330 and SP350 Pe...

Страница 10: ...2 Chapter 1 Single Unit Kit with 801708 801736 or 801722 801728 801735 Battery Pack Three Unit Kit with 801723 801724 801729 Battery Pack...

Страница 11: ...Unpacking and Parts Identification 3 Three Unit Kit with 801708 801736 or 801722 801728 801735 Battery Pack Five Unit Kit with 801723 801724 801729 Battery Pack...

Страница 12: ...01708 801736 or 801722 801728 801735 Battery Pack Item Description Part Model Reference Picture 37 mm Filter Cassette Kit 801709 25 mm Filter Cassette Kit 801726 Sampling media i e filter cassettes an...

Страница 13: ...on Part Model Reference Picture Cyclone Kit 801721 Single Non Adjustable Sorbent Tube Kit 801720 Single Adjustable Sorbent Tube Kit 801695 Double Adjustable Sorbent Tube Kit 801696 Sampling media i e...

Страница 14: ...e Adjustable Sorbent Tube Kit 801697 Low Flow Adapter Constant Pressure Controller 801699 Pump Service Kit 801725 Hard Single Unit Carry Case 12 2 x 8 x 3 75 1319315 Battery Pack 801708 801736 Samplin...

Страница 15: ...art Model Reference Picture Battery Pack 1600 mAH 1650 mAH 801723 801724 801729 Battery Pack 2700 mAH 801722 801728 801735 Power Supply with U S Line Cord 2613210 Soft Single Unit Carry Case 11 25 9 4...

Страница 16: ...Item Description Part Model Reference Picture Hard 5 Unit Carry Case 24 25 19 5 8 75 1319337 U Tube Kit 801704 Sorbent Tube Cover 2902021 Large Sorbent Tube Cover 2902024 Belt Clip for SIDEPAK Instrum...

Страница 17: ...m Description Part Model Reference Picture Sample Tube Vinyl 801693 37 mm Filter Cassette Clip 1309062 25 mm Filter Cassette Clip 1309164 Cyclone Filter Cassette Clip 1309157 Luer Adapter 1611303 Scre...

Страница 18: ...10 Chapter 1 Item Description Part Model Reference Picture SP330 SP350 User Guide 1980454 SP330 350 Quick Reference Card 1980540 SIDEPAK NimH Battery Maintenance Card 1980534...

Страница 19: ...H battery packs AA battery pack that allows you to use standard AA size batteries and ATEX approved 1600 mAH rechargeable nickel metal hydride battery You may also power the SP330 or SP350 with the po...

Страница 20: ...dePak NiMH Battery Maintenance All TSI SIDEPAK instruments can be used with all of the SIDEPAK Nickel Metal Hydride NiMH Batteries that incorporate the Smart Battery Management System technology These...

Страница 21: ...4 Maintenance Charging a NiMH Battery Pack found in all of the SIDEPAK instrument User Guides To discharge the various SIDEPAK instruments use the following procedure to minimize the time to discharg...

Страница 22: ...instruments every 4 to 6 weeks to ensure that the NiMH battery is maintained and charged and the Smart Battery Management System technology is optimized Simply follow the discharging and charging proc...

Страница 23: ...ells are included with the AA battery pack TSI recommends AA size alkaline batteries for best performance The power supply may be used to power the SP330 or SP350 while the AA battery pack is attached...

Страница 24: ...e the flat bladed screwdriver to gently pry up the positive end of the battery cells Close the battery pack Slide the battery pack into position placing the tab in place first Push the battery pack sn...

Страница 25: ...ted the display will show CHARGING BATTERY Once the battery is fully charged the display will show CHARGING COMPLETE The instrument may be turned on at any time during or after the charging process by...

Страница 26: ...ess and hold the PAGE key for three 3 seconds Release when the countdown reaches 0 SECONDS Use the PAGE key to go back to the previous menu Use the key to execute selected menu options and confirm cha...

Страница 27: ...one or other locations The rugged belt mountable unit is small quiet and lightweight minimizing interference and discomfort for the wearer The 12 character x 2 line LCD displays flow set point clear d...

Страница 28: ...nd hold the PAGE key for three 3 seconds Release when the countdown reaches 0 SECONDS Use the PAGE key to go back to the previous menu Use the key to execute selected menu options and confirm changes...

Страница 29: ...information Dust Plug Dust Plugs are provided to prevent intrusion of dust into the instrument during operation They should be removed from the Power Port for charging the instrument and replaced when...

Страница 30: ...gher level menu after 30 seconds Eventually the instrument returns to Ready Mode alternating between READY MODE ENTER START and ELAPSED TIME xxxx MIN You may also press the PAGE key at any time to man...

Страница 31: ...Operation 23 See Appendix E for Quick Reference Guide...

Страница 32: ...RANGE screen 4 Use the to adjust the pump to the desired flow rate based on the flow rate readings indicated from the external calibrator and press to execute when achieved 5 Now the Estimated Runtime...

Страница 33: ...e pump runtime and Delay Start Time The Total Time adjustment range is from 5 to 9999 minutes The Delay start adjustment range is from 0 to 999 minutes 1 After selecting the Set Program submenu under...

Страница 34: ...de the pump will automatically scroll through or you may manually scroll between the following screens Flow Mode The SIDEPAK SP330 and SP350 can be operated in either of two modes of operation for Flo...

Страница 35: ...the terminal end 5 Finally attach the adjustable sorbent tube holder to the short piece of tubing on the end of the LFA Next attach the end of the adjustable sorbent tube holder to an external calibra...

Страница 36: ...e outlet of the external calibrator to the inlet of the sample media 5 Turn the external calibrator on 6 Follow the Flow Setpoint and or the Low Flow Adapter Procedure found in this chapter to setup a...

Страница 37: ...in the battery packs The microprocessor monitors battery capacity and calculates run time information by dividing capacity of the battery mAH by the instantaneous current consumed by the instrument m...

Страница 38: ...urning the instrument on during the charging process will abort charging If the 6 cell AA size battery pack is detected regardless of installed cell type or there is no battery pack at all the display...

Страница 39: ...be inlet or the sorbent tube holder it may be necessary to blow compressed air into these parts and or to clean them with soap and water Use only soap and water do not use any chemicals that might lea...

Страница 40: ...than the cut off size pass through and all larger particles become trapped falling out of the air stream and are deposited in the grit pot at the bottom of the cyclone The cut off size for any make o...

Страница 41: ...lean it if necessary 1 Unscrew the grit pot from the bottom of the cyclone and pull the cap off 2 Hold the open end of the grit pot down and tap it on a hard surface to dislodge particles Repeat with...

Страница 42: ...if they become damaged In that event these parts may be replaced in the field by a competent person using the Pump Service Kit part no 801725 The pump service kit includes a new sample inlet 3 inlet...

Страница 43: ...Remove the filter and replace it with a new filter that comes with the pump service kit 801725 Make sure the filter sits properly in the groove of the inlet Attach the inlet to the pump case securely...

Страница 44: ......

Страница 45: ...corporated or a local TSI distributor to arrange for service Contact information TSI Incorporated 500 Cardigan Road Shoreview MN 55126 USA Tel 651 490 2811 or 1 800 874 2811 Website www tsi com E mail...

Страница 46: ...See Pump Service Kit section in Chapter 4 for more information Or return to factory for servicing Unable to attain desired flow High pressure drop Leaks Out of flow range Check for flow blockage or pi...

Страница 47: ...MH Check power supply type and use only SIDEPAK Power Supply P N 2613210 Instrument not getting power Battery not seated properly Battery leads damaged Adjust battery pack Check battery leads for dama...

Страница 48: ......

Страница 49: ...54 in H2O 1 500 cc min 40 in H2O 2 000 cc min 28 in H2O 2 500 cc min 19 in H2O 3 000 cc min 11 in H2O 3 500 cc min 0 in H2O Model SP350 1 000 cc min 28 in H2O 1 500 cc min 26 in H2O 2 000 cc min 25 i...

Страница 50: ...08 801722 801728 801735 or 801736 battery Weight 0 46 kg 16 oz with 801724 or 801729 battery 0 54 kg 19 oz with 801708 801722 801728 801735 or 801736 battery Display 2 line x 12 character LCD Tripod S...

Страница 51: ...sions EN61326 1997 Amendment A1 1998 ATEX Rating SP330 with 801723 801738 and 801729 Battery Packs C a u t i o n All Dust Plugs and gaskets must be installed on the SIDEPAK SP330 or SP350 in addition...

Страница 52: ...NiMH Pack P N 801735 5 5 hours No N A N A 6 Cell AA size Pack P N 801708 or 801736 N A No N A N A 1 Of a full depleted battery 2 All dust plugs and dust gaskets must be installed Battery Level Indica...

Страница 53: ...ttery Pack 5 10 15 35 25 5 23 5 31 24 21 5 28 5 21 5 20 5 27 NA NA Using Energizer AA size E91 alkaline batteries SP350 Battery Life Performance estimated hours Battery Back Pressure Flow Rate cc min...

Страница 54: ...40 0 25 mm GF 1 75 3 75 5 25 9 2 25 mm PVC 0 5 1 0 2 25 5 75 8 0 25 mm MCE 0 8 1 0 2 75 5 0 7 5 37 mm GF 1 6 3 2 4 75 6 5 37 mm Cellulose 2 0 4 3 6 75 9 25 37 mm Quartz 1 5 2 75 4 0 5 5 37 mm PVC 0 5...

Страница 55: ...47 Appendix B CSA Certificate of Compliance...

Страница 56: ...Appendix B 48...

Страница 57: ...CSA Certificate of Compliance 49...

Страница 58: ......

Страница 59: ...51 Appendix C LCIE ATEX Certificate of Compliance...

Страница 60: ...Appendix C 52...

Страница 61: ...CSA Certificate of Compliance 53...

Страница 62: ......

Страница 63: ...55 Appendix D EC Declaration of Conformity...

Страница 64: ......

Страница 65: ...57 Appendix E SP330 350 Quick Reference Guide See next page...

Страница 66: ...Appendix D 58...

Страница 67: ...491 95 21 90 E mail tsifrance tsi com Website www tsiinc fr Germany Tel 49 241 523030 E mail tsigmbh tsi com Website www tsiinc de India Tel 91 80 41132470 E mail tsi india tsi com China Tel 86 10 82...

Отзывы: