8
Wiring diagram
5
5 pol.
5 pol.
5 pol.
5 pol.
5
2
3
2 pol.
2 pol.
2A
0.25mm² BU
0.25mm² PK
BN 3/4
GN 1/2
YE 1/4
GY 0
WH 1/1
Made in Germany
Made in Germany
CP W
CP W
Tank
Tank
0
1/4
1/4
1/2
1/2
3/4
3/4
1/1
1/1
II
II
I
1
BU = blue
WH = white
PK = pink
BN = brown
GN = green
YE = yellow
GY = grey
Supply battery (battery II)
The fuse must be attached close to the positive terminal
of the battery.
Waste water tank
Fresh water tank
Installation of the filling level sensors
Waste water tank
The positions of the boreholes apply for symmetrical
tanks. The volume of non-symmetrical tanks needs to be
determined.
H
min. 50 mm
m
in
. 5
0
m
m
4 x 14
x
1
/
4 H4
H
Establish the height of the
tank (external dimensions).
Establish and mark the posi-
tion of the 5 boreholes for
the sensors (1/4 H).
9,5 – 10 mm
Drill 5 holes with a diameter
of 9.5 – 10 mm into the
waste water tank.
Smooth down the edges of
the boreholes.
Coat the screws with seal-
ing compound or an elastic
adhesive.
Assemble the measuring
sensors (1 wire of the 5-wire
line per measuring sensor).
Tighten the screws by hand.
Place each measuring sen-
sor into a borehole and
tighten with a screwdriver.
The edge of the rubber
seal is pressed against
the tank wall. The rubber
bulges inside thereby sealing
the borehole.
–
–
–
–
–
–
–
–
Содержание CP W
Страница 34: ......
Страница 35: ...Control Panel CP W...