2
TRUE RESIDENTIAL
®
INS TALL ATION CHECKLIS T
To ensure a proper installation, this checklist should be completed to ensure that no part of the
process has been overlooked.
Have all packaging materials been removed?
Have the anti-tip brackets been installed securely and are they properly engaging the unit?
Is the unit leveled properly with all leveling legs making contact with the floor? Has the toe kick
been installed?
Has door stop been installed (if needed)?
Are panels attached securely and properly aligned? (Overlay cabinets only).
Does the customer understand the unit’s operation?
Has the customer been given the key and literature package?
Have stainless steel surfaces been inspected for any imperfections? This is to be done by the
authorized True dealer or installer with the customer, upon completion of installation. Stainless
steel doors, handles and shelves are covered by a limited 30-day warranty for cosmetic defects.
Is the unit operating properly? If not, is the unit plugged in? Is the control turned on?
Содержание TRUE RESIDENTIAL TBC-24-L-OG-B
Страница 2: ...THANK YOU FOR YOUR PURCHASE ...
Страница 29: ...27 15 INCH 24 INCH INSTALL GUIDE Back of drawer 8 7 6 24 INCH DRAWER OVERLAY PANEL ...
Страница 57: ...55 15 INCH 24 INCH INSTALL GUIDE NOTES ...
Страница 64: ...62 TRUE RESIDENTIAL S h e l v i n g A d j u s t m e n t 52 53 PRESERVE THE MOMENT ...
Страница 66: ...64 TRUE RESIDENTIAL S t a c k i n g K i t I n s t r u c t i o n s 54 60 PRESERVE THE MOMENT ...
Страница 80: ...78 TRUE RESIDENTIAL NOTES ...
Страница 81: ...79 15 INCH 24 INCH INSTALL GUIDE NOTES ...
Страница 82: ...80 TRUE RESIDENTIAL LINE NOTES ...
Страница 83: ......
Страница 84: ...CONTACT US www true residential com 636 240 2400 toll free 888 616 8783 SD 12 18 250 WP XXX 975557 ...