True Fitness Technology • O’Fallon, MO • Phone: 800-426-6570/636-272-7100 • Truefitness.com
Page # 70 of 86
CHAPTER 2: ASSEMBLY GUIDE
Strength
Palladium Modular Training Systems
ASSEMBLY STEPS:
Step 16-7 (Lat Pulldown Station):
Secure the Logo Plate to the Upright
Assembly as shown in Step 8 (Logo
Plate).
Secure the Workout Placard to the
Upright Assembly as shown in Step 11
(Workout Placard).
Lastly, secure the Middle Assembly
and Lower Assembly to the Upright
Assembly using the identified hardware.
Item
Part Number
Description
Quantity
1
C 455B
HH SCREW, 3/8”-16, 4”
4
2
C 754D
WASHER, FLAT, 3/8”
12
3
C 742C
NYLON LOCK NUT, 3/8”-16
6
4
C 452B
HH SCREW, 3/8”-16, 3”
2