
S
TEP
11: I
NSTALL
THE
L
EG
E
XT
/C
URL
C
ABLE
1. Route the Leg Extension/Curl cable
as shown.
2. Install the pulleys and associated
hardware as you go along.
3. Be sure the cable clears the
retaining bolts and that the pulleys
can rotate freely.
Open Access plate to
assist cable routing.
Be sure the cable clears this
retaining bolt and is routed
correctly on the pulley.
A
3/16” CABLE
Strength
Strength
MP
MP 33.0
.0,, 33.5
.5, & 4.0
, & 4.0
TTrrue Fi
ue Fittnnes
ess T
s Teecchn
hnoolog
logy • O
y • O’’FFaalllo
lon, M
n, MO • P
O • Phhoonne: 800-426-6570/636-272-7100 • T
e: 800-426-6570/636-272-7100 • Trr
uefi
uefi
ttnnes
ess.co
s.com
m
Page # 35 of 64