True Fitness Technology • O’Fallon, MO • Phone: 800-426-6570/636-272-7100 • Truefitness.com
Page # 44 of 81
CHAPTER 2: ASSEMBLY GUIDE
Strength
Atlas HD
OPTIONAL ASSEMBLY STEPS:
Step 11B (XFT-900 & FT-900 Configurations):
Assemble the XFT-900 assembly to the center
main frame using the identified hardware.
Secure all hardware from Steps 11-12B.
Confirm the XFT-900/FT-900 assembly is level
using the leveling feet located throughout the
machine.
Item
Part Number
Description
Quantity
1
C1137
SHCS, 3/8”-16, 3-15/16”
8
2
C 754C
Washer, Flat, 3/8”
16
3
C 766A
Lock Nut, 3/8”-16
8
4
XFT900
XFT-900 Assembly
1