17
Step 1:
Move the two
left-
curved
tines (labelled "
A
" in
Figure 28) from the left outer
holder to the "
B
" position on the
right outer holder. Move the two
left-curved
tines which were at
the "
B
" position to "
A
."
Figure 28: Exchanging position of tines at "A" and "B."
Figure 29: Exchanging position of tines at "C" and "D."
Figure 30: Exchanging position of tines at "E" and "F."
Figure 31: Exchanging position of tines at "G" and "H."
Step 2:
Move the two
right-
curved tines
from position "
C
"
on the left inner holder to the
"
D
" position on the right inner
holder. Move the two right-
curved tines which were at the
"
D
" position to "
C
." See Figure
29.
Step 3:
Move the two
left-
curved
tines from the "
E
"
position on the left inner holder
to the "
F
" position on the right
inner holder. Move the two
left-
curved
tines which were at the
"
F
" position to "
E
." See Figure
30.
Step 4:
Move the two
right-
curved
tines from position "
G
"
on the left outer holder to the
"
H
" position on the right outer
holder. Move the two
right-
curved
tines which were at the
"
H
" position to "
G
." See Figure
31.
I
MPORTANT: Make sure
that the cutting edges on all
tines will enter the soil first
when the tiller is moving
forward.
A
B
C
D
E
F
G
H