background image

General information regarding safety

Only skilled qualified personnel are allowed to 
perform the described work on the expansion
module. Only skilled qualified electricians are 
allowed to work on the electrical system.
For all work performed on EASYLAB components,
the following regulations and guidelines must be
complied with. This applies in particular to the 
following German country specific regulations or as
appropriate in the country where the installation is
taking place:
• Equipment and Product Safety Laws (GPSG)
• Industrial Health and Safety Regulations

(BetrSichV) 

• Accident Prevention Regulations (BGV A1, 

BGV A3)

General safety measures

• Large temperature differences

Condensation can damage the electronics 
beyond repair. If the expansion module has been
kept in an unheated area, wait at least two hours
before switching on the supply voltage for 
commissioning.

• Electrostatic charge

Electrostatic charge can damage the electronics.
For this reason, first touch an equipotentially 
bonded metal surface, e.g. a water pipe, for 
electrical earthing before you remove the unit
from its protective wrapping. Avoid skin contact
with any components or printed circuits on the
expansion module or the main PCB.

• Installing the PCB

Tighten the mounting screws and distance pieces
only hand-tight to avoid damage to the PCB or to
the fixing points in the casing.

• Foreign matter and liquids

If liquid gets onto the PCB or inside the 
expansion module, let the expansion module
completely dry before commissioning. Remove
foreign matter, if any.
If the device emits a smell or smoke, have it 
checked by the manufacturer.

4

EM-LON Operating Manual / Leaflet no. M375EV4 (3/2013)

2

Safety and correct use

Correct use

The EM-LON expansion module provides a 
LonWorks interface for EASYLAB base 
components.
• Use the expansion module only for an EASYLAB

TCU3 controller or a TAM adapter module.

• Use the expansion module only within the 

ranges given in the technical data.

• When used on a room controller or adapter

module with active room management function
(RMF) the expansion module provides data for
the entire room.

• When used on a fume cupboard controller, room

controller or adapter module the expansion
module provides access to the data of the 
controller. 

• Observe the technical data of the expansion

module.

Incorrect use

Do not use the expansion module outdoors, in wet
areas, or in potentially explosive atmospheres.

Residual risks

Failure of the LonWorks interface does not affect
the control function of the volume flow controller but
does affect data exchange with the central BMS.
Additional safety measures are required for 
safety-relevant applications.

Содержание EM-LON

Страница 1: ...Operating Manual Leaflet no M375EV4 3 2013 The art of handling air Operating and Installation Manual EASYLAB Expansion module EM LON LonWorks interface for EASYLAB TCU3 controllers and TAM adapter mo...

Страница 2: ...ion __________________ 5 Product overview and technical data ______ 5 Functional description ________________ 6 4 Transport storage and packaging ________ 6 5 LonWorks network variables ____________ 8...

Страница 3: ...le it is essential to read this operating and installation manual before starting any work and to comply with it The manual must be given to the facilities manager when handing over the system The fac...

Страница 4: ...he PCB Tighten the mounting screws and distance pieces only hand tight to avoid damage to the PCB or to the fixing points in the casing Foreign matter and liquids If liquid gets onto the PCB or inside...

Страница 5: ...LON B LON A SH SH LON A LON B Technical data Supply voltage 5 V DC from the TCU3 controller or TAM adapter module Communication LonWorks transceiver FTT 10A Free Topology Twisted Pair Acceptable tempe...

Страница 6: ...e and away from direct sunlight Temperature 10 C to 70 C Maximum humidity 90 non condensing Packaging Properly dispose of packaging material Functional description The EM LON expansion module suppleme...

Страница 7: ...s_p x x Differential pressure setpoint value for the room nvoPressAct SNVT_press_p x x Differential pressure actual value for the room nvoLocalAlarm SNVT_switch x x x x x Single controller alarm nvoSu...

Страница 8: ...nd outputs TCU3 Overview of additional data points for EM LON LonWorks interface firmware version 2 0 and TCU firmware version 3 0 Name of variable Data type FH RR TAM RR RMF TAM RMF Meaning nviSC_Loc...

Страница 9: ...DampPosMin_FH nvoDampPosMin_RE nvoDampPosMin_RS nvoDampPosMin_TE nvoLocalAlarm nvoManOverride nvoMode nvoOccCmd nvoManOverride_R nvoMode_R nvoOccCmd_R nvoPressAct nvoPressAlarm nvoPressSet nvoSummaryA...

Страница 10: ...pieces 1 into the corresponding openings in the TCU3 or TAM main PCB and tighten them hand tight only Step 2 Take the pin header 2 and push it from below through the EM LON PCB 3 just far enough such...

Страница 11: ...d the holes for the distance pieces are above the distance pieces Then press the PCB onto the distance pieces In case the positions do not exactly line up check whether the pin header is still correct...

Страница 12: ...work Depending on the network topology controllers at the end of a chain may be connected to one bus controllers at other positions in the chain may be connected to two buses Strip the insulation from...

Страница 13: ...ommissioning Press the service pin push button and download the software for the EASYLAB LonWorks node The software for the EM LON expansion module is available for download on our website 2 Binding C...

Страница 14: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 14...

Страница 15: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 15...

Страница 16: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 16...

Отзывы: