Assembly material specification and quantity
:
basic frame 1pcs
X axis guide rail parts
20*18*650 1PCS
Print head parts
1pcs
drag chain plate
1pcs
screws
M4*20 6PCS
Step 3: Sliding plate assembly
1
pulley
X axis guide rail
M4 screws holes positioning
print head
3-M4*20
3-M4*20
2
2
3
4
6
1.Insert the print head into the X-axis guide rail, pay attention to the direction of the M4 screw hole, as
shown in Figure 1.
2. Insert the X-axis rail assembly into the alignment hole of the chassis, and tighten the screw
RM4*20 without locking it, as shown in Figure 2.
3. Move the left and right sliders to confirm that the X-axis rail assembly moves flexibly after locking
the RM4*20 screw.
4. After adjustment, lock the screw of RM5*25 on the Y-axis guide and move the X-axis guide assembly
again. Repeat the adjustment to ensure that the slide is flexible and has no gap after the locking screw.
As shown in the figure, the pulley on the print head
runs through the X axis guide rail and the slide
block moves smoothly without any clearance
The skateboard is in line with
the X-axis guide
Содержание X5SA-500-PRO
Страница 1: ......
Страница 22: ...17 5 Interface operation and printing ...
Страница 26: ...2 How to use slice software Type setting follow the steps below to complete the setting 21 ...
Страница 31: ......
Страница 32: ......