![Triton ZENICA 8.5kW Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/triton/zenica-8-5kw/zenica-8-5kw_installation-and-operating-instructions-manual_1169090023.webp)
23
Zenica
5
Shower varies
from normal
temperature to cold
during use.
6
Pressure relief
device has operated
(water ejected from
PRD tube).
5.1
Water pressure has
dropped below minimum
required.
6.1
Blocked shower head.
6.2
Twisted/blocked
flexible shower hose.
6.3
Shower head
not removed while
commissioning.
5.1.1
Wait until the water pressure returns to
normal.
6.1.1
Clean or replace blocked sprayplate in
shower head and then fit new PRD.
6.2.1
Check for free passage through hose.
Replace the hose if necessary and fit new PRD.
6.3.1
Fit new PRD. Commission unit with
shower head removed.
Note:
Identify cause of operation before fitting new PRD unit.
When fitting a new PRD, follow the commissioning procedure.
It is advised all electrical maintenance/repairs to the shower
should be carried out by a suitably qualified person.
In the unlikely event of a fault occurring please contact Customer Experience.
Do not remove the shower from the installation.
FAULT FINDING
Problem Cause
Action
WEEE Directive – Policy Statement
As a producer and a supplier of electric showers, Triton Showers is committed to the protection of the
environment via our own environmental policy and compliance with the
WEEE directive
.
Triton Showers is fully registered with the Environment Agency under the following scheme:
Repic: Producers take-back scheme (PTS), registration number WEE/EJ3466QV
All our electric products are labelled accordingly with the crossed out wheeled bin symbol. This indicates, for
disposal purposes at end of life, that these products must be taken to recognised collection points, such as local
authority sites/local recycling centres; this will be free of any charges.
Do not return to Triton Showers.