Monobasin mixer
4
the upper waste outlet -
DO NOT tighten at
this stage.
Align the lower fitting such that the control arm
faces towards the rear of the basin and secure.
Slide the top half of the plunger control rod
through the opening in the rear of the mixer
unit. From the underside of the basin, screw the
lower section of the control rod into the top rod
and tighten.
Push the control lever down and then slide the
fixing block onto the control lever. The fixing
block is designed to move along the lever to
allow for correct positioning
(Fig.6)
.
Slide the fixing block so that the control rod can
fit through the block
(Fig.7)
. Tighten the screw
to secure the plunger control rod.
Place the plunger in the waste assembly. To alter
the plunger gap, remove the plunger and adjust
the screw in the plunger base
(Fig.8)
.
FINISHING THE INSTALLATION
IMPORTANT:
Before completing the
connection of the water supply to the inlets
of the mixer, flush out the system to remove
any debris in the pipework. This can be done
by connecting a hose to the pipework and
turning on the mains water supply long
enough to clear the debris to waste.
Connect the steel braided hoses to the hot
and cold supplies using standard ½” BSP tap
connectors.
Connect the waste outlet to standard 1¼” waste
trap.
OPERATION
The mixer has handwheel controls for both hot
and cold.
To close the waste gate pull the control rod at
the rear of the unit upwards
(Fig.9)
. This will
drop the plunger into the outlet. To open the
waste gate push the rod down.
Slide the control rod
into the fixing block
and secure
Fixing block
Control lever
Control rod
Fig.7
Adjust the
screw length to
alter the gap
Fig.8
Fixing
block
Control
lever
Control rod
Slide fixing block
into position
Fig.6
Pull rod to
operate
waste gate
Fig.9
Содержание Unichrome Aire
Страница 6: ...Monobasin mixer 6 ...
Страница 7: ...Monobasin mixer 7 ...