11
• Remove the unit from the wall. Drill and
plug the wall.
(An appropriate drill bit should be used. If the
wall is plasterboard or a soft building block,
appropriate wall plugs should be fitted).
• Screw the top fixing screw into position
leaving the base of the screw head
protruding 6mm out from the wall.
• Hook the backplate over the top screw and
fit the bottom fixing screws into position,
but
DO NOT
fully tighten the screws at this
stage. The fixing holes are elongated to
allow for out of square adjustment after the
plumbing connection has been completed.
• Connect the mains water supply to the inlet
DO NOT
use excessive force when making
the connection.
• Make sure the backplate is square on the
wall and tighten the retaining screws which
hold it to the wall.
• Turn on the mains water supply and check
for leaks in the pipework connection to the
shower.
NOTE:
At this stage no water can flow through
the unit.
IMPORTANT:
A suitable sealant should always
be used to seal around the incoming pipework to
prevent water entering the wall.
7
Continued
SECTION
Fig.10
Fixing holes
WARNING
Check there are no hidden cables or
pipes before drilling holes for wall plugs.
Use great care when using power tools near
water. The use of a residual current device
(RCD) is recommended when
using power tools.