Exe Inclusive Bar Mixer Shower
9
FITTING THE CONTROLS
The controls will need to be fitted before
commissioning can be carried out.
Temperature control -
right hand side
(
fig 10)
Fit the maximum temperature stop in the
orienntation shown
.
Fit the temperature control ensuring that the
temperature override engages with the maxium
temperature stop. Once in place, fit the retaining
screw.
Flow control
-
left hand side
(fig.11)
To fit the flow control, the flow control cartridge
needs to be turned fully clockwise until it stops.
NOTE:
The flow control graphic (styles of this
may vary) should be positioned so that the
front edge of it is at the 12 o’clock position.
The remainder of the graphic should run
towards you.
If fitted correctly, the graphic and flow control
should now be sitting in the designed ‘OFF’
position.
Once in place, fit the retaining screw.
Do not fit the end trims until the commissioning
procedure has been carried out and the
temperature range checked.
Fig.11
Front of
graphic in the
12 o’clock
position
Flow control graphic
(style may vary)
Fig.10
Marker to be
located at the 12
o’clock position
when fitted to valve.
Turn the flow
control fully
clockwise
Maximum
temperature
stop