background image

Concentric thermostatic mixer valve

1

As a guide for the size of hole, it should be large 
enough to accept the valve complete with the 
inlet and outlet fittings and also allow access for 
connection to the pipework.
Remove the plaster and brickwork to the required 
depth and chase out any additional areas of the 
wall to give access to the pipework to and from 
the valve plus any outlet fittings. Note that the 
valve body requires a deeper recess than the inlet 
and outlet fittings.
Note: The outlet pipework must end in a suitable 
female thread parallel 15mm x ½” BSP fitting 
(not supplied).
Offer the valve body up to the wall and mark the 
fixing holes. Remove the valve, drill and plug the 
wall. Route the pipework to valve body position.

Installation in a hollow wall

Decide on the shower position and determine 
whether the hot and cold water supplies will 
enter the shower from the top (falling) or bottom 
(rising) or rear 

(fig.18)

.

When installing into a stud partition or other 
hollow wall structures, the installer will need 
to consider fabricating rear supports or other 
options. Such options are beyond the scope of 
this guide.
Mark the route of the incoming and outgoing 
pipework.
Take out the plasterboard (use the cover plate or 
tiling shroud as a template). Offer the valve body 
up to the fabrication and mark the two fixing 
holes. 
Remove the valve and drill the holes. Route the 
pipework to the valve position.

Installation in a panel or cubicle

When installing into a panel or cubicle structure 
the installer will need to consider fabricating 
rear supports or other options. Such options are 
beyond the scope of this guide. 
Typically, there should be at least 65mm space 
from the surface of the panel to the rear of the 
valve body.

ImPoRtant: access to the rear of the 
valve must be available.

Fig.18

Fig.19

Содержание DART Eco

Страница 1: ...be left with the user 2180600F August 2009 DART Eco concentric thermostatic mixer valve Installation and operating instructions Eco Statement This product has been fitted with a flow regulator to del...

Страница 2: ...THE BULKHEAD PIPEWORK or FIXED HEAD 14 LEAK TESTING Both mixers 14 MAKING GOOD Both mixers 14 BULKHEAD ASSEMBLY 15 To fit a flow regulator 15 ANTI SCALD PROTECTION Both mixers 16 Fitting the coverplat...

Страница 3: ...X2 Main components MAIN COMPONENTS 6 Cover plate 7 Mounting plate 8 Outlet bulkhead 9 Nutted long thread connector 10 Wall trim X2 3 4 6 7 8 9 All dimensions listed in this fitting book regarding the...

Страница 4: ...a minimum flow of 8 litres per minute should be available to both inlets Water temperature requirements Maximum hot water temperature 80 C Recommended maximum 65 C Minimum hot water temperature 55 C...

Страница 5: ...y accessible in line filters are used to aid maintenance Hard water areas a If it is intended to operate the shower in areas of hard water above 200 ppm temporary hardness a scale inhibitor may have t...

Страница 6: ...fed system with a pump to boost pressures as shown please refer to the pump installation guide to establish the minimum head requirements for automatic operation of the pump kits are for illustration...

Страница 7: ...linder For systems with no cold water take off after the appliance reducing valve it will be necessary to fit an additional drop tight pressure reducing valve when the mains pressure is over 5 bar The...

Страница 8: ...running An expansion vessel must be fitted and regularly maintained to ensure the unit is not damaged by excess pressures This may already be installed externally or internally within the thermal stor...

Страница 9: ...he accessories showerhead riser rail and or fixed showerhead can be positioned above or to either side of the shower refer to fig 7 The valve must be installed in a position that allows for easy acces...

Страница 10: ...e wall is brick plasterboard or a soft building block appropriate wall plugs and screws should be fitted Fit the mounting plate onto the wall fig 9 The inlet elbows allow for either rising falling or...

Страница 11: ...connection The O ring may need to be removed if it is not on the appropriate side of the hex nut and placed onto the opposite side fig 13 Flow regulation A flow regulator is supplied for use with hig...

Страница 12: ...rtable reached of the user The accessories showerhead riser rail and or fixed showerhead can be positioned above or to either side of the shower refer to fig 14 Supply pipe work Complete the pipework...

Страница 13: ...in depth for the mounting plate is given in fig 16 from the plaster finish but this is dependent upon tile and adhesive thicknesses The inlet elbows allow for either rising falling or rear entry hot a...

Страница 14: ...termine whether the hot and cold water supplies will enter the shower from the top falling or bottom rising or rear fig 18 When installing into a stud partition or other hollow wall structures the ins...

Страница 15: ...lbows have O ring seals fig 6 to the body and do not require PTFE tape or other means of sealing IMPORTANT Make sure that all supply pipework has been flushed through before fitting the mixer fig 20 C...

Страница 16: ...If fitting into a flush wall make an additional 8mm allowance for this shoulder at the finished surface The connector can be cut to size if required The threaded connector should protrude from the fi...

Страница 17: ...building block appropriate wall plugs and screws should be fitted If fitting to a hollow wall structure it may be preferable to secure the bulkhead by applying a bead of silicon seal to the back of t...

Страница 18: ...r and tightened fig 29 COMMISSIONING Start the water flow by rotating the flow control Make sure that both the hot and cold water supplies are fully open and at or near to their design temperature and...

Страница 19: ...hand fig 28 When the showering temperature is satisfactory turn off the shower Recommended outlet temperatures The BuildCert TMV scheme recommends the following set maximum mixed water outlet temperat...

Страница 20: ...position with the grub screw fitting positioned on the left hand side Once the maximum temperature stop in place tighten the retaining grub screw fig 29 c Fit the temperature control making sure the...

Страница 21: ...ing temperature rotate the temperature control clockwise for cooler and anti clockwise for hotter fig 31 To override the maximum temperature stop depress the button and rotate the temperature control...

Страница 22: ...been designed to comply with the requirements of BS EN 1111 BS EN 1287 WRAS 0 0 0 6 0 0 5 bar l min Pressure Flow rate 10 15 20 25 30 35 40 45 50 55 60 1 2 1 8 2 4 3 0 3 6 4 2 4 8 FLOW CHART Flow rate...

Страница 23: ...Concentric thermostatic mixer valve 21 72mm All dimensions listed in this fitting book regarding the product and installation are approximate Dimensions 150mm 84mm G 1 2 35mm 120mm G1 2 195mm...

Страница 24: ...y 86002900 5 Service kit 83312810 6 Adapter 83312840 Ref Description Part No 7 Flow regulators are available from Triton at the following ratings 3 Ltr min 22010310 4 Ltr min 22011740 5 Ltr min 220117...

Страница 25: ...eck the function of the non return valves The non return valves NRVs prevent cross flow between hot and cold supplies under unequal pressure conditions They are designed for long life with no maintena...

Страница 26: ...ators not fitted 1 1 1 Refer to commissioning section 1 2 1 Reposition the temperature control 1 3 1 Reposition the temperature control 1 4 1 Turn off shower and consult a competent plumber or contact...

Страница 27: ...ouse and if necessary contact local water company 4 2 1 Inspect the filters Clean if necessary 4 3 1 Turn off the shower and consult a suitably competent plumber 4 4 1 Clean the showerhead 4 5 1 Reduc...

Страница 28: ...o treat all staff members with respect Should any employee feel threatened or receive abuse either verbally or physically Triton reserves the right to withhold service and will support the employee wi...

Отзывы: