background image

Triton Systems ©

14

TDN 07103-00283 

Rev: B

71. Route the Shutter cable through the opening, 

(arrow).

72. Route the Shutter Data Cable through the small 

opening (

YELLOW  

Circle) and plug it into the 

dispenser (

YELLOW  

Arrow). 

73. Route the Dispenser data cable through the 

opening, (Arrow). 

74. Route the Dispenser Data cable through the small 

opening (

YELLOW 

Circle) and plug it into the 

dispenser,(

YELLOW 

Arrow).

75. TY Wrap both cables to the outside of the 

Dispenser cover as shown. 

76. Push both cables down into the opening of the 

handle, (Arrow). 

77. Route the dispenser power cord through the 

opening, (Arrow). 

Содержание ATMGurus ARGO FT

Страница 1: ...of Triton Systems of Delaware LLC e third party trademarks that may be identi ed herein are the trademark of their respective owners Triton disclaims any a liation connection or association between i...

Страница 2: ...your ARGO FT to accommodate exterior wall thickness If you currently have a collapsed con gured model accommodates walls up to 5 you can extend the unit accommodates walls up to 10 is procedure includ...

Страница 3: ...Triton Systems 3 TDN 07103 00283 Rev B Table of Contents R P T S T R D V A E NMD R C W H P C U C R F ATM M U C C V S C H U C G I NMD V U T...

Страница 4: ...8 Screws Long 10 Torx 20 A002809 Screws Short 10 Torx 16 A002576 Le Extension Spacers Plastic Snap on 5 A002577 Right Extension Spacers Plastic Snap on 5 A009212 6 inch ground Wire Discard not used in...

Страница 5: ...p menu screen or on the keypad press and hold the CTRL key press the 1 key then release both keys 2 Input a user ID and password to access Management Functions menu e factory default settings are 00 f...

Страница 6: ...Disconnect the Dispenser Data cable in RED box Disconnect Shutter cable in BLUE circle 5 Remove the two cables from the opening in the handle 6 Carefully pull the AC Power cord Dispenser data cable an...

Страница 7: ...the 10 extension 11 Remove the ground cable Yellow arrow from under the white and black clips Red arrows Also will need to disconnect ground from side of dispenser clamps 12 While holding the BOU remo...

Страница 8: ...Circle Ensure the cables are not damaged or cut when installing the BOU 24 Secure the BOU to the dispenser with 8 of the short screws A002809 Rectangle 25 Secure the other side of the BOU to the disp...

Страница 9: ...wires to the bracket Arrow 34 Cut all TY Wraps securing cables to wire harness 35 Cut TY Wrap securing cables to the bracket Arrow P C U C 36 In the vault verify all cable are loose not in a white cl...

Страница 10: ...ton recommends three technicians perform this conversion Due to the bulk and weight of the upper cabinet could cause personnel injury and equipment damage Caution Caution M U C 42 Loosen the bolt on t...

Страница 11: ...stall and tighten two bolts as show Yellow arrows 47 Tighten the six bolts on outside of cabinet 48 Insert the plug box into the opening under the front of the cabinet Arrow 49 Secure the plug box fro...

Страница 12: ...de of the bottom cabinet Arrow S C H 53 Obtain the assembled wire track 54 Loosely TY Wrap the Shutter cable dispenser data and power cable to the wire bracket 55 e length of dispenser data and shutte...

Страница 13: ...Grommet in the right opening Arrow 66 Inside the upper cabinet install a Grommet in the le opening Arrow I NMD V 67 Open the cabinet door and fully extend both rails 68 Caution Ensure the cables are...

Страница 14: ...penser YELLOW Arrow 73 Route the Dispenser data cable through the opening Arrow 74 Route the Dispenser Data cable through the small opening YELLOW Circle and plug it into the dispenser YELLOW Arrow 75...

Страница 15: ...er switch Arrow is in the On position U T Open the Upper cabinet and Turn the power switch on the power supply to the ON I position On the POST screen verify all components were found and active Log i...

Страница 16: ...Triton Systems 16 TDN 07103 00283 Rev B...

Отзывы: