Triton Aquatronic 2 Plus Скачать руководство пользователя страница 24

Triton Showers 

Triton Road 

Nuneaton 

Warwickshire  CV11 4NR

Triton is a division of Norcros Group (Holdings) Limited

TRITON reserve the right to change product specification without prior notice. E&OE. © TRITON SHOWERS 2014

Customer Service: 

0844 980 0750

Trade Installer Hotline: 

0844 980 0730 

Fax: 

 

0844 980 0744

www.tritonshowers.co.uk 

E-mail: [email protected]

Extended Warranty AVAILABLE NOW. Call 0844 980 0740 for more details.

TRITON STANDARD GUARANTEE

With the exception of accessories, Triton guarantee the 
product against all manufacturing defects for a period of

2 years

 (for domestic use only) from the date of purchase, 

provided that it has been installed by a competent person in 
full accordance with the fitting instructions.

All accessories such as shower heads, hoses and riser rails 
carry a 

1 year

 parts only guarantee against manufacturing 

defects.

Any part found to be defective during this guarantee period 
we undertake to repair or replace at our option without 
charge so long as it has been properly maintained and 
operated in accordance with the operating instructions, and 
has not been subject to misuse or damage. This product 
must not be taken apart, modified or repaired except by a 
person authorised by Triton. This guarantee applies only to 
products installed within the United Kingdom and does not 
apply to products used commercially. This guarantee does 
not affect your statutory rights.

What is not covered: 

1.

 Breakdown due to: 

a)

 use other than domestic use by 

you or your resident family; 

b)

 wilful act or neglect; 

c)

 any malfunction resulting from the incorrect use or 

quality of electricity, gas or water or incorrect setting 
of controls; 

d)

 failure to install in accordance with this 

installation guide

2.

 Claims for missing parts once the product has been 

installed.

3.

 Repair costs for damage caused by foreign objects or 

substances.

4.

 Total loss of the product due to non-availability of parts.

5.

 Compensation for loss of use of the product or 

consequential loss of any kind.

6.

 Call out charges where no fault has been found with the 

appliance.

7.

 The cost of repair or replacement of pressure relief 

devices, showerheads, hoses, riser rails and/or wall 
brackets, isolating switches, electrical cable, fuses and/
or circuit breakers or any other accessories installed at 
the same time.

8. 

The cost of routine maintenance, adjustments, overhaul 

modifications or loss or damage arising therefrom, 
including the cost of repairing damage, breakdown, 
malfunction caused by corrosion, furring,

9.

 Call out charges where the water supply cannot be 

isolated, this includes consequential losses arising from 
unserviceable supply valves.

12-03-14

UK SERVICE POLICY

In the event of a product fault or complaint occurring, the following 

procedure should be followed:

1.

   Telephone Customer Service on 

0844 980 0750

 having available, 

your details including post code, the model number and power 

rating of the product, together with the date of purchase and, where 

applicable, details of the particular fault.

2.

   If required, the Customer Service Advisor will arrange

 

for a qualified engineer to call.

3.

   All products attended to by a Triton service engineer must be 

installed in full accordance with the Triton installation guide 

applicable to the product. (Every product pack contains an 

installation guide, however, they can also be bought via our 

Customer Service Spares Department).

4.

   Our engineer will require local parking and if a permit is required this 

must be available to the engineer on arrival at the call.

5.

   It is essential that you or an appointed representative (who must 

be over 18 years of age) is present for the duration of the service 

engineer's visit. If the product is in guarantee you must produce 

proof of purchase.

6.

   Where a call under the terms of guarantee has been booked and the 

failure is not product related (i.e. scaling and furring, incorrect water 

pressure, pressure relief device operation or electrical/plumbing 

installation fault) a charge will be made. A charge will also be issued 

if nobody is at home when the service engineer calls or adequate 

parking/permit is not available.

7.  

If the product is no longer covered by the guarantee an up front 

fixed fee will be charged before the site visit.

8

.   Should proof of purchase not be available on an “in-guarantee” call, 

or should the service engineer find that the product is no longer 

under guarantee, the engineer will charge the same fixed price and 

the customer will be expected to pay the engineer before he leaves. 

If payment is not made on the day an administration charge will be 

added to the fixed charge.

9.  

If a debt is outstanding from a previous visit, or from any other Triton 

purchase, Triton reserves the right to withhold service until the debt 

has been settled.

10.

 Triton takes the health, safety and wellbeing of its employees very 

seriously and expects customers to treat all staff members with 

respect. Should any employee feel threatened or receive abuse, either 

verbally or physically, Triton reserves the right to withhold service

Replacement Parts Policy

Availability:

 It is the policy of the manufacturer to maintain parts 

availability for the duration of production and a period of five years 

thereafter, in accordance with industry standards.
Spare parts are available via our website, www.tritonshowers.co.uk, or by 

telephoning Triton Customer Service Spares Department. Payment should 

be made by credit/debit card (excluding American Express or Diners 

Card). Payment can also be made by pre-payment of a pro forma invoice 

by cheque or money order.
Telephone orders are based on information given during of the call.

Before contacting Triton, please verify your requirements using 

the information contained in the supplied user guide. Triton 

cannot accept liability for incorrect part identification.

For the latest Terms & Conditions, please see: 

www.tritonshowers.co.uk

Содержание Aquatronic 2 Plus

Страница 1: ...2180701G October 2014 Installation and operating instructions T00336 Installers please note these instructions are to be left with the user Aquatronic 2 Plus electric shower ...

Страница 2: ...rvice policy etc rear cover CONTENTS Page To check the product suitability for commercial and multiple installations please contact Triton s specification advisory service before installation Telephone Facsimile E mail 0844 980 0730 0844 980 0744 technical tritonshowers co uk WARNING This appliance can be used by children aged from 8 years and above and persons with reduced physical sensory or men...

Страница 3: ... could also cause the PRD Pressure Relief Device in the unit to operate 1 9 This product is not suitable for mounting into steam rooms or steam cubicles 2 PLUMBING 2 1 The plumbing installation must comply with Water Regulations Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS EN 806 2 2 The supply pipe ...

Страница 4: ... the sprayplate in the showerhead has not become blocked DO NOT place items such as soap or shampoo bottles on top of the unit Liquid could seep through the joint between the cover and backplate and possibly damage the sealing rubber INTRODUCTION This book contains all the necessary fitting and operating instructions for your electric shower Please read them carefully The shower installation must ...

Страница 5: ...ing valve 6 Solenoid valve 7 Outlet pipe 8 Pressure relief device PRD 9 Terminal block 10 Pressure switch flag assembly 11 Top cable pipe entry 12 Wall screw fixings 13 Cover screw fixings 14 Earth connection 15 Water inlet Inside cover fig 2 16 START STOP switch NOTE Not all wiring has been shown for reasons of clarity Fig 1 Fig 2 11 6 5 4 3 13 13 13 12 12 2 9 14 15 1 8 7 16 10 ...

Страница 6: ...switch off the whole installation at the mains supply and remove the correct fuse 3 The shower must be connected to its own independent electrical circuit IT MUST NOT be connected to a ring main spur socket outlet lighting circuit or cooker circuit 3 1 The electrical supply must be adequate for the loading of the unit and existing circuits 4 Check your consumer unit main fuse box has a main switch...

Страница 7: ...while standing in a bath or shower cubicle It should be readily accessible to switch off after using the shower 7 Where shower cubicles are located in any rooms other than bathrooms all socket outlets in those rooms must be protected by a 30mA RCD 8 The current carrying capacity of the cable must be at least that of the shower circuit protection see Table B 8 1 To obtain full advantage of the powe...

Страница 8: ...res it may be necessary to select a low power setting to achieve your preferred shower temperature The water supply can be taken from a cold water storage cistern provided there is a minimum head of ten metres above the showerhead It must be an independent supply to the shower only If it is intended to operate the shower at pressures above the maximum or below the minimum stated contact Customer S...

Страница 9: ... back flow Pressure relief safety device A pressure relief device PRD is designed into the shower unit which complies with European standards The PRD provides a level of appliance protection should an excessive build up of pressure occur within the shower DO NOT operate the shower with a damaged or kinked shower hose or a blocked showerhead which can cause the PRD to operate When commissioning the...

Страница 10: ...the trimplate side will have to be cut With the elbow compression fitted on the outlet temporarily place the trimplate into position then mark the pipe entry on the side of the trimplate Carefully remove the appropriate area using a junior hacksaw WARNING Check there are no hidden cables or pipes before drilling holes for wall plugs Use great care when using power tools near water The use of a res...

Страница 11: ...wer use the backplate as a template and mark the two fixing holes fig 10 Drill and plug the wall An appropriate drill bit should be used If the wall is plasterboard or a soft building block appropriate wall plugs should be fitted Screw the top fixing screw into position leaving the base of the screw head protruding 6mm out from the wall Hook the backplate over the bottom screw and fit the top fixi...

Страница 12: ...d turn on the mains water supply long enough to clear the debris to waste Procedure Turn off the water supply either at the mains stopvalve or the isolating stopvalve Connect the mains water supply to the inlet of the shower via 15mm copper stainless steel or plastic pipe using a 15mm x 15mm brass compression fitting Note The inlet fitting is designed to enter a compression fitting only DO NOT use...

Страница 13: ...eating Note The supply cable earth conductor must be sleeved The outer sheath of the supply cable must be stripped back to the minimum The supply cable must be secured either by routing through conduit or in trunking or by embedding in the wall in accordance with current IEE regulations The use of connections within the unit or other points in the shower circuit to supply power to other equipment ...

Страница 14: ...at is situated at the bottom right hand side of the unit fig 16 Note The plug and socket can only fit one way Check to ensure that the wiring is not trapped and replace the cover squarely to the backplate and guide into position so that the knobs locate correctly into the splined spindles Should any difficulty arise recheck the points above While applying slight pressure to the cover secure in pos...

Страница 15: ... mains water supply to the shower at the isolating stopvalve and then turn on the electric supply to the shower at the isolating switch The power indicator will light Press the START STOP button fig 19 and wait until water starts to flow from the flexible hose Slowly rotate the temperature control fully anti clockwise to the maximum flow position fig 20 It will take about thirty seconds for a smoo...

Страница 16: ...low achievable for your preferred temperature Adjustment of the temperature control on the COLD setting will only alter the force of the water from the showerhead It will not alter the water temperature Note If the stated flow rate required for the unit cannot be met due to low water pressure it will be necessary to operate the unit on economy setting during the warmer months because of flow rate ...

Страница 17: ...ockwise fig 22 this will increase the flow of water through the shower making it cooler To increase the shower temperature Turn the temperature control clockwise fig 23 this will decrease the flow of water through the shower making it warmer Note It is advisable to be certain that the showering temperature is satisfactory by testing with your hand before stepping under the showerhead There will al...

Страница 18: ...er TP Temperature Protection During normal operation if the temperature exceeds the showering safety limit the power to the elements will be removed completely although water will continue to flow When the temperature has cooled sufficiently power to the elements will be automatically restored to the settings at the time of interruption Safety cut out The unit is fitted with a non resettable therm...

Страница 19: ...h is part of the solenoid valve fig 25 To access the filter remove the trimplate then disconnect and remove the compression fitting Also depending on the incoming pipework arrangements if there is not enough slack in the pipework it could mean the removing the unit from the wall When cleaning the filter DO NOT use a sharp object as it will cause damage It is preferable to use an old toothbrush or ...

Страница 20: ...assembly 9 5kW P07810709 5 Stabiliser valve assembly P07810800 6 Solenoid valve assembly 83300450 7 Outlet pipe PRD 82800830 8 Pressure Relief Device PRD 82800450 9 Terminal block wires 82301500 10 Front cover assembly P22710600 complete 11 START STOP switch ass 83305380 12 Insert trim cover 7052245 12 Insert trim backplate 7052244 10 6 5 4 3 NOTE Wiring is not shown for reasons of clarity 1 2 7 9...

Страница 21: ...cked showerhead clean or replace blocked sprayplate in showerhead 2 2 1 Check if stop valves are fully open Check if a blockage in the inlet filter 2 3 1 Readjust flow rate to give increased flow 2 3 2 Select ECONOMY power 3 1 1 See Water too hot causes 2 1 2 2 and 2 3 and their appropriate action cures If it continues contact Triton Customer Service 4 1 1 Reduce flow rate via temperature control ...

Страница 22: ...operated Have the unit checked by a suitably qualified engineer or contact Customer Service 5 1 1 Wait until the water pressure resumes to normal 6 1 1 Clean or replace blocked sprayplate in showerhead and then fit new PRD 6 2 1 Check for free passage through hose Replace the hose if necessary and fit new PRD 6 3 1 Fit new PRD Commission unit with showerhead removed 7 1 1 Replace switch 7 2 1 Repl...

Страница 23: ...ly registered with the Environment Agency under the following schemes Repic Producers take back scheme PTS registration number WEE EJ3466QV Valpak Distributor take back scheme DTS registration number 9659 All our electric products are labelled accordingly with the crossed out wheeled bin symbol This indicates for disposal purposes at end of life that these products must be taken to a recognised co...

Страница 24: ... available your details including post code the model number and power rating of the product together with the date of purchase and where applicable details of the particular fault 2 If required the Customer Service Advisor will arrange for a qualified engineer to call 3 All products attended to by a Triton service engineer must be installed in full accordance with the Triton installation guide ap...

Отзывы: