Site survey:
A qualified engineer must survey the
installation site to determine the
correct ground preparation for the size
and weight of the Veefil-PK user unit, in
accordance with local regulations.
The Veefil-PK user unit is best
installed following the recommended site
configuration requirements.
Ground fixing:
The Veefil-PK user unit is to be fixed to
the ground through the baseplate fixing
holes with 4 x M16 fasteners. Fasteners
are not supplied, as the type required de
-
pends on the foundation used and must
be chosen by the installer accordingly.
The fasteners should fix the Veefil-PK
user unit securely to the foundation
through the baseplate in accordance with
the dimensions and fixing points shown in
Figure 3: Base plate dimensions.
Conduit requirement:
110mm OD conduit.
When preparing the foundation, en-
sure that conduit and wiring terminates
above ground according to the document
TRI103.INS.003 Veefil-PK Piping and
Cabling.
Foundation requirements:
The foundation must be flat, even, and
have the appropriate density for the
weight of the Veefil-PK user unit.
Check the flatness and level of the
foundation and level of the Veefil-PK user
unit baseplate prior to fixing.
Communications:
4G network capability.
Cat 6 Ethernet cable required with a
minimum length from the foundation
surface according to the document
TRI103.INS.003 Veefil-PK Piping and
Cabling.