8
TRI105.INS.001.9
Veefil-PK TRI105-350-01 Installation manual
www.tritium.com.au
Veefil® is a registered trademark of Tritium Pty Ltd. © 2018 Tritium Pty Ltd
1. Open crate
Move the crate as close to the
prepared installation site as possible.
Ensure there is enough room to
manoeuvre the lifting apparatus.
Remove/slide out all crate tubes to
disassemble the cardboard crate.
2. Lift Veefil-PK user unit to vertical
Securely attach the lifting straps at the
top of Veefil-PK to the lifting apparatus
and gently raise to a standing position on
the shipping baseplate.
NOTE: The Veefil-PK user unit is 2040mm
tall on the shipping baseplate.
Once upright remove all wrapping.
Ensure the connection to the lifting
apparatus is secure at all times.
Shipping
Baseplate
Lifting Straps
Unpacking
Содержание Veefil TRI105-350-01
Страница 2: ......