6. Operation and Configuration of S3M UPS Models
and Battery Cabinets
EOD Battery Volt:
End of discharge voltage is the low voltage cutoff of the batteries during a battery mode operation. The
value can be 1.60~1.90. The default value is 1.67V/cell, or 10.02Vdc per battery.
Float Temp Compen Coeff:
Modifies the voltage of compensation after enabling the switch. The value can be
0.001~0.007V/cell/°C. The default value is 0.003V/cell/°C.
Boost Charge Setting:
Boost charge can be set to Disable or Enable. The default value is Enable.
No Battery Warning:
Keep this alarm enabled if you want the UPS to provide a warning when no batteries are present. The
default value is Enable.
6.4 Configuration Reference Table for S3M10-50K UPS and
BP240V09/09K/09-NIB or BP240V40/40-NIB/40L/40L-NIB Battery
Cabinet Models
Configurations for S3M10-20kVA UPS with Internal Batteries
UPS with Intenal
batteries
Battery
Cabinet
Qty. of
Battery
Cabinets
Step 1
Step 2
Step 3
Step 4
Step 5
Battery
Group
Battery
Number
Single
Battery
(Ah)
Capability
Max Charge
Current (A)
Aver Changing
Duration (min)
Time (minutes) to
Charge Batteries to
90% at 25°C
10kVA
S3M10K1B
BP240V09K
1
5
20
9
6.75
500
S3M10K2B
BP240V09K
1
6
20
9
8.1
500
S3M10K3B
BP240V09K
1
7
20
9
9.45
500
15kVA
S3M15K2B
BP240V09K
1
6
20
9
8.1
500
S3M15K3B
BP240V09K
1
7
20
9
9.45
500
20kVA
S3M20K3B
BP240V09K
1
7
20
9
9.45
500
Содержание BP240V09
Страница 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Страница 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Страница 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Страница 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Страница 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Страница 121: ...121 5 Instalación Figura 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Страница 124: ...124 5 Instalación Figura 5 44A 2 Retire las placas superior lado derecho y lado izquierdo Figura 5 44 ...
Страница 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Страница 196: ...196 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Страница 199: ...199 5 Installation Figure 5 44A 2 Retirer les plaques du haut de droite et de gauche Figure 5 44 ...
Страница 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...