Page 7 of 35
MACHINE PREPARATION
7) RECOVERY TANK
Open the lid and confirm the following
connections are secure:
a) The vacuum cover is securely attached.
Align the notches and rotate the cover
clockwise to close. The vacuum hose
must also be attached.
b) Confirm that the squeegee hose is properly
connected.
c) Confirm that the drain hose plug, which is
located at the front of the machine, is
closed.
8) SOLUTION WATER
Fill the solution tank with clean water at a
temperature not higher than 50°C / 122°F. Add
the proper concentration of liquid detergent by
following the manufacturer instructions. Excess
foam in the recovery tank can damage the
vacuum motor, so use only the minimum amount
of detergent necessary. Reassemble the cover.
WARNING!
Always use low foaming
detergent. Adding antifoam liquid into
the recovery tank before cleaning will also help
prevent foaming.
NEVER USE ACID, BLEACH or AMMONIA
9) BRUSH INSTALLATION
a) Lift the brush base by depressing the foot
level at the rear of the machine.
b) Place the brushes under the base. Align
the brush lugs with the holes in the brush
plate. Insert the brushes into the plate and
turn each brush so the lugs are pushed
toward their retaining springs, until locked.
The photo shows the directions to rotate
the brushes to lock them into operating
position.
Vacuum
Cover
Squeegee
Hose
Solution Tank
Fill Opening
Содержание Ace 26BA1
Страница 17: ...Page 17 of 35 Brush Deck Assembly Drawing 1...
Страница 19: ...Page 19 of 35 Main Frame Assembly Drawing 2...
Страница 21: ...Page 21 of 35 Squeegee Arm Assembly Drawing 3...
Страница 23: ...Page 23 of 35 Squeegee Assembly Drawing 4...
Страница 25: ...Page 25 of 35 Solution Tank Assembly Drawing 5...
Страница 27: ...Page 27 of 35 Recovery Tank Assembly Drawing 6...
Страница 29: ...Page 29 of 35 Vacuum Assembly Drawing 7...
Страница 31: ...Page 31 of 35 Switch Box Assembly Drawing 8...
Страница 33: ...Page 33 of 35 Electrical Schematic Drawing 9...