Page 4 of 35
MACHINE PREPARATION
1) UNPACKING THE MACHINE
a) Take off the outer
packaging.
b) The machine is fastened to
the pallet with wooden
wedges that block the
wheels. Remove tie down
straps.
c) Using a ramp, pull the
machine off the pallet.
2) BATTERY INSTALLATION
a) Remove the squeegee hose
from the recovery tank.
b) Remove the vacuum cover
by rotating it
counterclockwise.
c) Remove recovery tank by
lifting tank by lift chain at the
back of the tank and the
drain hose at the front of the
tank.
Remove
Remove
Lift Chain
Drain Hose Lift Point
Содержание Ace 26BA1
Страница 17: ...Page 17 of 35 Brush Deck Assembly Drawing 1...
Страница 19: ...Page 19 of 35 Main Frame Assembly Drawing 2...
Страница 21: ...Page 21 of 35 Squeegee Arm Assembly Drawing 3...
Страница 23: ...Page 23 of 35 Squeegee Assembly Drawing 4...
Страница 25: ...Page 25 of 35 Solution Tank Assembly Drawing 5...
Страница 27: ...Page 27 of 35 Recovery Tank Assembly Drawing 6...
Страница 29: ...Page 29 of 35 Vacuum Assembly Drawing 7...
Страница 31: ...Page 31 of 35 Switch Box Assembly Drawing 8...
Страница 33: ...Page 33 of 35 Electrical Schematic Drawing 9...