System synchronization: valve-repeater-controller
synchronization table
OPERATION
Location
Control indication
5
Press the technician button
Repeater
After some thirty seconds, all four indicators will flash.
Make sure that the green indicator lights are continuously on (voltage, valve
communication and controller communication.)
6
Ensure valve indication transfer
CONTROL
After another thirty seconds, the open valve indicator indicates the valve's
state (open or closed.)
7
Hook the controller to the main
supply with the transformer.
CONTROL
Check that the valve opens and closes accordingly.
Make sure that the open valve indicator indicates the valve's state (open or
closed.)