4
6. Lift unit into place and support unit while
securing to permanent ceiling, ceiling joists, etc.
See Sketch C.
CAUTION:
DO NOT ALLOW FULL WEIGHT OF UNIT TO
REST ON T-BAR CEILING.
7. Connect electrical power to unit. See Field
Wiring Diagram, Page 3.
THE NATIONAL ELECTRICAL CODE
REQUIRES THE USE OF FLEXIBLE
CONDUIT FOR INPUT WIRING TO A CHAIN
SUSPENDED UNIT.
8. If available clearance between permanent
ceiling and T-Bar ceiling is less than 11”,
mounting angles must be relocated on unit as
required. This will result in further extension of
the unit below the ceiling line.
9. If a charcoal filter is used, remove filter from
plastic bag and locate on air exit side of filter.
10. Re-install media and charcoal filter.
11.
Close access door and unit is ready for
operation.
FLUSH MOUNT INSTALLATION
1. Carefully unpack the unit and check for damage
incurred in shipment. Report any damage to the
freight carrier immediately.
2. Select a location near the center of the area to
be cleaned and locate the ceiling joists in that
area.
3.
Locate four mounting points (each being at a
joist) and pre-drill holes into the joist and unit
housing as shown in Sketch D.
4. Lift unit to ceiling and secure using four ¼ “ X 2
½ “ lag bolts as shown in Sketch D.
5. Connect electrical power to unit. See Field
Wiring Diagram.