background image

 

 

 

TABLE OF CONTENTS 

 

 

 

 

 

 

 

 
 

       

                 Page 

 I. 

Specifications.................................................................................................................................3 

 

 

 

II. Preparation For Installation .........................................................................................................3 

 

    New Unit Inspection......................................................................................................................3 

 

    Operation .......................................................................................................................................3 

          How it Operates.............................................................................................................................3 
 

    Unit Operation ...............................................................................................................................3 

          Ducting Application ......................................................................................................................4 
 
 III. 

Installation ....................................................................................................................................4 

 

     Liquid Aerosol ..............................................................................................................................5 

 

     Electrical Installation ...................................................................................................................5 

 
 IV. 

Maintenance .................................................................................................................................5 

 

     Cleaning ........................................................................................................................................5 

 

     Wash Ionizing/Collecting Cells ...................................................................................................6 

           Inspections ...................................................................................................................................6 
 
 

V. Replacement Parts Ordering Information ..................................................................................6 

 

 

 VI. 

Warranty .......................................................................................................................................6 

 
 

VII. Troubleshooting Guide ..............................................................................................................7 

 

       Troubleshooting Diagram .........................................................................................................8 

 
 

       

 

VIII. Diagrams / Exploded View Figures 

 

Figure 1 – T5200 Unit Assembly ......................................................................................................9 

 

Figure 2 – T5200 Enclosure Assembly..........................................................................................10 

 

Figure 3 – T5200 Blower Motor Assembly (2HP and 3HP) ..........................................................11 

 

Figure 4 – T5200 Blower Motor Assembly (5HP)..........................................................................12 

 

Figure 5 – Ionizer/Collector Cell ....................................................................................................13 

 

Figure 6 – T5200 Blower Curve......................................................................................................14 

 

Figure 7 – Wiring Diagram..............................................................................................................15 

 

 

      IX. Contact Information...................................................................................................................16 
 
 
 
 

 

 

 
 
 
 
 
 
 
 
 
 

Содержание Air Boss T5200

Страница 1: ...s T Series Model T5200 INSTALLATION OPERATION SERVICE Electrostatic Precipitator for Industrial Applications 101 McNeill Road Sanford NC 27330 919 775 2201 Fax 919 777 6399 800 884 0002 www trioninc c...

Страница 2: ...ing Collecting Cells 6 Inspections 6 V Replacement Parts Ordering Information 6 VI Warranty 6 VII Troubleshooting Guide 7 Troubleshooting Diagram 8 VIII Diagrams Exploded View Figures Figure 1 T5200 U...

Страница 3: ......

Страница 4: ...hung Eyebolts can be supplied by Trion NEW UNIT INSPECTION Immediately upon receiving the unit carefully examine the package for damage during transit If the unit is damaged contact the last carrier...

Страница 5: ...ly distributed across the entire face area of the unit The prefilters provide some resistance to effect even air distribution However since most air ducts are designed to handle air velocities greater...

Страница 6: ...n completed assure that the equipment is ready for start up by checking the following A All construction debris is removed from the ionizing collecting cells drain connections and ductwork B The drain...

Страница 7: ...of Material for the Model T 5200 Use these pages to determine the part numbers of the items needed To order parts contact your local Trion representative and provide the following information a Unit...

Страница 8: ...rdering Information for replacement parts Before performing any troubleshooting ensure the correct input line voltage is present VII TROUBLESHOOTING GUIDE IF PROBLEM CANNOT BE DETERMINED OR CORRECTED...

Страница 9: ...7 8...

Страница 10: ...9...

Страница 11: ...10...

Страница 12: ...11...

Страница 13: ...12...

Страница 14: ...13...

Страница 15: ...14...

Страница 16: ...15...

Страница 17: ...on GmbH Fedders International Boscstr 60 No 728 Fuzhou Road D 50171 Kerpen Rm 3002 3005 Germany Raffles City Office Tower Tel 49 0 2237 922 103 Shanghai P R China 200001 Fax 49 0 2237 922 104 Tel 86 2...

Отзывы: